Sheet 01 · Ongoing assignments

Ongoing assignments

22 assignments under way. Filter by country or sector.

Sheet 02 · Current assignments

Current assignments

The assignments we are working on now, followed by photos our teams took in the field in 2026.

Sector

22 assignments

  1. October 2026Ongoing

    MaliIrrigation and lowland development

    Consulting services for the control and supervision of rehabilitation and extension works on the Daye, Hamadja and Korioumé schemes in the Tombouctou district, on behalf of the Tombouctou Rice Plains Development Project (PMPRT)

    Client
    Ministère de l’Agriculture
    Funding
    BOAD (West African Development Bank)
    Input (person-months)
    24
  2. September 2026Ongoing

    MaliIrrigation and lowland development

    Control and supervision of full water control development works on the Woloni and Sirimanso schemes under the second phase of the PDI-BS in the Moyen Bani area

    Client
    Ministère de l’Agriculture
    Funding
    BOAD (West African Development Bank)
    Input (person-months)
    262
  3. September 2026Ongoing

    MaliRural roads and bridges

    Preliminary design (APS), detailed design (APD), environmental and social impact assessment (ESIA), socio-economic studies and preparation of bidding documents (DAO), and control and supervision of works for rural access infrastructure and rural tracks in the Koulikoro, Nara and Nioro regions

    Client
    P2-P2RS Mali
    Funding
    AfDB
    Input (person-months)
    18
  4. September 2026Ongoing

    MaliRural roads and bridges

    Control and supervision of development works on 40 km of rural tracks under the second phase of the PDI-BS in the Moyen Bani area

    Client
    Ministère de l’Agriculture
    Funding
    BOAD (West African Development Bank)
    Input (person-months)
    135
  5. August 2026Ongoing

    Burkina FasoDrinking water and pastoral water supply

    Feasibility, preliminary design (APS), detailed design (APD) and environmental and social assessment studies for five (05) multi-village drinking water supply systems in the Centre-Nord, Sahel and Nord regions, on behalf of the Drinking Water and Sanitation Services Improvement Project for Resilience Building (PASEPA-2R)

    Client
    Ministère de l’Agriculture, de l’Eau et des Ressources animales et halieutiques
    Funding
    AfDB
  6. August 2026Ongoing

    MaliBuildings and other facilities

    Environmental and social impact assessments for trading posts in the Koutiala, Ségou and Sikasso regions

    Client
    PRSA
    Funding
    World Bank
  7. July 2026Ongoing

    Côte d'IvoireRural roads and bridges

    Technical studies and preparation of the technical parts of the bidding documents for the rehabilitation of rural roads in the Bounkani region

    Client
    PCR-CI
    Funding
    World Bank
    Input (person-months)
    24
  8. May 2026Ongoing

    TogoIrrigation and lowland development

    Control and supervision of works for rural access (rural tracks), hydro-agricultural development, drinking water supply and building construction

    Client
    Programme d’urgence de renforcement de la résilience et de la sécurité des communautés (PURS)
    Funding
    BOAD (West African Development Bank)
  9. April 2026Ongoing

    MauritaniaRural roads and bridges

    Supervision of works for a spur road (7.48 km) between Baghdâd and Gueibine in the Trarza wilaya (Rosso municipality) and a rural track (1.5) opening up the Dabane-Winding axis in the Brakna wilaya (M’bagne municipality)

    Client
    Ministère de l’Agriculture et de la Souveraineté alimentaire
    Funding
    World Bank
    Input (person-months)
    24
  10. March 2026Ongoing

    MauritaniaBuildings and other facilities

    Consultant for the supervision and control of school infrastructure construction works in the municipality of Sangrava (lot 11)

    Client
    ETR-ML
    Funding
    World Bank
    Input (person-months)
    12
  11. March 2026Ongoing

    TogoIrrigation and lowland development

    Control and supervision of rehabilitation works on the Koutoukpa irrigated scheme

    Client
    Ministère de l’Agriculture, de la Pêche, des Ressources animales et de la Souveraineté alimentaire
    Funding
    IDA and GAFSP (grants)
  12. February 2026Ongoing

    GuineaRural roads and bridges

    Recruitment of a firm to complete the control and supervision of rehabilitation works on 313.107 km of tracks and the construction of two (2) bridges in the Coyah, Boffa and Boké prefectures

    Client
    Ministère de l’Agriculture
    Funding
    IBRD (International Bank for Reconstruction and Development)
    Input (person-months)
    3
  13. January 2026Ongoing

    TogoBuildings and other facilities

    Control and supervision of construction works for five (5) warehouses and related infrastructure in the planned agricultural development zones (ZAAP) of Tône, Tandjouaré, Oti, Cinkassé and Kpendjal-Ouest, in five (05) lots

    Client
    Ministère de l’Agriculture, de la Pêche, des Ressources animales et de la Souveraineté alimentaire
    Funding
    IDA and GAFSP (grants)
  14. January 2026Ongoing

    TogoIrrigation and lowland development

    Recruitment of a firm for the control and supervision of rehabilitation works on five (05) water reservoirs in the Savanes region

    Client
    Ministère de l’Agriculture, de la Pêche, des Ressources animales et de la Souveraineté alimentaire
    Funding
    IDA and GAFSP (grants)
  15. December 2025Ongoing

    MaliBuildings and other facilities

    Technical, architectural, environmental and social studies, and control and supervision of works for the construction of the teacher training institute (IFM) in Bamako, the extension of the Sikasso and Ségou IFMs and the rehabilitation of the Mopti IFM

    Client
    Projet d’amélioration de la qualité et des résultats de l’éducation pour tous au Mali (MIQRA)
    Funding
    World Bank
  16. November 2025Ongoing

    BeninIrrigation and lowland development

    Detailed technical, socio-economic, financial and environmental studies for full water control hydro-agricultural schemes covering a net area of 2,937 hectares in the municipality of Malanville

    Client
    Société béninoise des aménagements agricoles (SoBAA SA)
    Funding
    Own budget (state grant)
    Input (person-months)
    33
  17. January 2025Ongoing

    SenegalRural roads and bridges

    Preliminary design (APS) and detailed design (APD) studies and supervision of works for 32 km of tracks in the Oussouye and Ziguinchor departments

    Client
    Programme national de développement des agropoles du Sénégal
    Funding
    AfDB
  18. May 2024Ongoing

    NigerIrrigation and lowland development

    Recruitment of a firm for technical studies for the construction of water infrastructure and the supervision of works

    Client
    PCRSS-Niger
    Funding
    World Bank
    Input (person-months)
    125
  19. November 2021Ongoing

    MaliDrinking water and pastoral water supply

    Implementation of support measures for water/WASH projects in the Koro district, Mopti region

    Client
    PROJES
    Funding
    GIZ Mali
    Input (person-months)
    98
  20. August 2020Ongoing

    TogoIrrigation and lowland development

    Consulting engineering services for detailed design (APD) studies, preparation of bidding documents (DAO), technical assistance to the administration in procurement, and control and supervision of works execution

    Client
    Projet de développement rural de la plaine de l’Oti, zone 5
    Funding
    BOAD loan
    Input (person-months)
    107
  21. 2016Ongoing

    SenegalDrinking water and pastoral water supply

    Complementary studies and supervision of water works in the Matam, Tambacounda, Kédougou and Kolda regions

    Client
    AGETIP Sénégal
    Funding
    IsDB and WAEMU
    Input (person-months)
    157
  22. 2016Ongoing

    MaliIrrigation and lowland development

    Consulting services for detailed technical studies and control and supervision of hydro-agricultural development works on 1,256 ha of irrigated schemes in the OHVN area (Figuiratomo-Selingué, Balanzan, Koursalé and Séguela) under the PRESAN-KL

    Client
    AGETIER-Mali
    Funding
    GAFSP grant
    Input (person-months)
    144

Sheet 03 · Ongoing assignments

Our teams' schedule, month by month

Schedule of ongoing assignments by start month
  1. Consulting services for the control and supervision of rehabilitation and extension works on the Daye, Hamadja and Korioumé schemes in the Tombouctou district, on behalf of the Tombouctou Rice Plains Development Project (PMPRT)Mali · BOAD (West African Development Bank)
    Start : October 2026 ; Ongoing
  2. Control and supervision of full water control development works on the Woloni and Sirimanso schemes under the second phase of the PDI-BS in the Moyen Bani areaMali · BOAD (West African Development Bank)
    Start : September 2026 ; Ongoing
  3. Preliminary design (APS), detailed design (APD), environmental and social impact assessment (ESIA), socio-economic studies and preparation of bidding documents (DAO), and control and supervision of works for rural access infrastructure and rural tracks in the Koulikoro, Nara and Nioro regionsMali · AfDB
    Start : September 2026 ; Ongoing
  4. Control and supervision of development works on 40 km of rural tracks under the second phase of the PDI-BS in the Moyen Bani areaMali · BOAD (West African Development Bank)
    Start : September 2026 ; Ongoing
  5. Feasibility, preliminary design (APS), detailed design (APD) and environmental and social assessment studies for five (05) multi-village drinking water supply systems in the Centre-Nord, Sahel and Nord regions, on behalf of the Drinking Water and Sanitation Services Improvement Project for Resilience Building (PASEPA-2R)Burkina Faso · AfDB
    Start : August 2026 ; Ongoing
  6. Environmental and social impact assessments for trading posts in the Koutiala, Ségou and Sikasso regionsMali · World Bank
    Start : August 2026 ; Ongoing
  7. Technical studies and preparation of the technical parts of the bidding documents for the rehabilitation of rural roads in the Bounkani regionCôte d'Ivoire · World Bank
    Start : July 2026 ; Ongoing
  8. Control and supervision of works for rural access (rural tracks), hydro-agricultural development, drinking water supply and building constructionTogo · BOAD (West African Development Bank)
    Start : May 2026 ; Ongoing
  9. Supervision of works for a spur road (7.48 km) between Baghdâd and Gueibine in the Trarza wilaya (Rosso municipality) and a rural track (1.5) opening up the Dabane-Winding axis in the Brakna wilaya (M’bagne municipality)Mauritania · World Bank
    Start : April 2026 ; Ongoing
  10. Consultant for the supervision and control of school infrastructure construction works in the municipality of Sangrava (lot 11)Mauritania · World Bank
    Start : March 2026 ; Ongoing
  11. Control and supervision of rehabilitation works on the Koutoukpa irrigated schemeTogo · IDA and GAFSP (grants)
    Start : March 2026 ; Ongoing
  12. Recruitment of a firm to complete the control and supervision of rehabilitation works on 313.107 km of tracks and the construction of two (2) bridges in the Coyah, Boffa and Boké prefecturesGuinea · IBRD (International Bank for Reconstruction and Development)
    Start : February 2026 ; Ongoing
  13. Control and supervision of construction works for five (5) warehouses and related infrastructure in the planned agricultural development zones (ZAAP) of Tône, Tandjouaré, Oti, Cinkassé and Kpendjal-Ouest, in five (05) lotsTogo · IDA and GAFSP (grants)
    Start : January 2026 ; Ongoing
  14. Recruitment of a firm for the control and supervision of rehabilitation works on five (05) water reservoirs in the Savanes regionTogo · IDA and GAFSP (grants)
    Start : January 2026 ; Ongoing
  15. Technical, architectural, environmental and social studies, and control and supervision of works for the construction of the teacher training institute (IFM) in Bamako, the extension of the Sikasso and Ségou IFMs and the rehabilitation of the Mopti IFMMali · World Bank
    Start : December 2025 ; Ongoing
  16. Detailed technical, socio-economic, financial and environmental studies for full water control hydro-agricultural schemes covering a net area of 2,937 hectares in the municipality of MalanvilleBenin · Own budget (state grant)
    Start : November 2025 ; Ongoing
  17. Preliminary design (APS) and detailed design (APD) studies and supervision of works for 32 km of tracks in the Oussouye and Ziguinchor departmentsSenegal · AfDB
    Start : January 2025 ; Ongoing
  18. Recruitment of a firm for technical studies for the construction of water infrastructure and the supervision of worksNiger · World Bank
    Start : May 2024 ; Ongoing
  19. Implementation of support measures for water/WASH projects in the Koro district, Mopti regionMali · GIZ Mali
    Start : November 2021 ; Ongoing
  20. Consulting engineering services for detailed design (APD) studies, preparation of bidding documents (DAO), technical assistance to the administration in procurement, and control and supervision of works executionTogo · BOAD loan
    Start : August 2020 ; Ongoing
  21. Complementary studies and supervision of water works in the Matam, Tambacounda, Kédougou and Kolda regionsSenegal · IsDB and WAEMU
    Start : 2016 ; Ongoing
  22. Consulting services for detailed technical studies and control and supervision of hydro-agricultural development works on 1,256 ha of irrigated schemes in the OHVN area (Figuiratomo-Selingué, Balanzan, Koursalé and Séguela) under the PRESAN-KLMali · GAFSP grant
    Start : 2016 ; Ongoing