AI-generated ambient image

Sheet 03 · References

References

162 design and works supervision assignments in 9 countries. Filter by sector, country or funding agency.

162 references

  1. Irrigation and lowland development

    Control and supervision of full water control development works on the Woloni and Sirimanso schemes under the second phase of the PDI-BS in the Moyen Bani area

    Period
    2026 Ongoing
    Country
    Mali
    Client
    Ministère de l’Agriculture
    Funding
    BOAD (West African Development Bank)
    Input (person-months)
    262
  2. Irrigation and lowland development

    Consulting services for the control and supervision of rehabilitation and extension works on the Daye, Hamadja and Korioumé schemes in the Tombouctou district, on behalf of the Tombouctou Rice Plains Development Project (PMPRT)

    Period
    2026 Ongoing
    Country
    Mali
    Client
    Ministère de l’Agriculture
    Funding
    BOAD (West African Development Bank)
    Input (person-months)
    24
  3. Irrigation and lowland development

    Control and supervision of works for rural access (rural tracks), hydro-agricultural development, drinking water supply and building construction

    Period
    2026 Ongoing
    Country
    Togo
    Client
    Programme d’urgence de renforcement de la résilience et de la sécurité des communautés (PURS)
    Funding
    BOAD (West African Development Bank)
    Input (person-months)
  4. Irrigation and lowland development

    Recruitment of a firm for the control and supervision of rehabilitation works on five (05) water reservoirs in the Savanes region

    Period
    2026 Ongoing
    Country
    Togo
    Client
    Ministère de l’Agriculture, de la Pêche, des Ressources animales et de la Souveraineté alimentaire
    Funding
    IDA and GAFSP (grants)
    Input (person-months)
  5. Irrigation and lowland development

    Control and supervision of rehabilitation works on the Koutoukpa irrigated scheme

    Period
    2026 Ongoing
    Country
    Togo
    Client
    Ministère de l’Agriculture, de la Pêche, des Ressources animales et de la Souveraineté alimentaire
    Funding
    IDA and GAFSP (grants)
    Input (person-months)
  6. Buildings and other facilities

    Environmental and social impact assessments for trading posts in the Koutiala, Ségou and Sikasso regions

    Period
    2026 Ongoing
    Country
    Mali
    Client
    PRSA
    Funding
    World Bank
    Input (person-months)
  7. Buildings and other facilities

    Consultant for the supervision and control of school infrastructure construction works in the municipality of Sangrava (lot 11)

    Period
    2026 Ongoing
    Country
    Mauritania
    Client
    ETR-ML
    Funding
    World Bank
    Input (person-months)
    12
  8. Buildings and other facilities

    Control and supervision of construction works for five (5) warehouses and related infrastructure in the planned agricultural development zones (ZAAP) of Tône, Tandjouaré, Oti, Cinkassé and Kpendjal-Ouest, in five (05) lots

    Period
    2026 Ongoing
    Country
    Togo
    Client
    Ministère de l’Agriculture, de la Pêche, des Ressources animales et de la Souveraineté alimentaire
    Funding
    IDA and GAFSP (grants)
    Input (person-months)
  9. Drinking water and pastoral water supply

    Feasibility, preliminary design (APS), detailed design (APD) and environmental and social assessment studies for five (05) multi-village drinking water supply systems in the Centre-Nord, Sahel and Nord regions, on behalf of the Drinking Water and Sanitation Services Improvement Project for Resilience Building (PASEPA-2R)

    Period
    2026 Ongoing
    Country
    Burkina Faso
    Client
    Ministère de l’Agriculture, de l’Eau et des Ressources animales et halieutiques
    Funding
    AfDB
    Input (person-months)
  10. Rural roads and bridges

    Preliminary design (APS), detailed design (APD), environmental and social impact assessment (ESIA), socio-economic studies and preparation of bidding documents (DAO), and control and supervision of works for rural access infrastructure and rural tracks in the Koulikoro, Nara and Nioro regions

    Period
    2026 Ongoing
    Country
    Mali
    Client
    P2-P2RS Mali
    Funding
    AfDB
    Input (person-months)
    18
  11. Rural roads and bridges

    Control and supervision of development works on 40 km of rural tracks under the second phase of the PDI-BS in the Moyen Bani area

    Period
    2026 Ongoing
    Country
    Mali
    Client
    Ministère de l’Agriculture
    Funding
    BOAD (West African Development Bank)
    Input (person-months)
    135
  12. Rural roads and bridges

    Technical studies and preparation of the technical parts of the bidding documents for the rehabilitation of rural roads in the Bounkani region

    Period
    2026 Ongoing
    Country
    Côte d'Ivoire
    Client
    PCR-CI
    Funding
    World Bank
    Input (person-months)
    24
  13. Rural roads and bridges

    Supervision of works for a spur road (7.48 km) between Baghdâd and Gueibine in the Trarza wilaya (Rosso municipality) and a rural track (1.5) opening up the Dabane-Winding axis in the Brakna wilaya (M’bagne municipality)

    Period
    2026 Ongoing
    Country
    Mauritania
    Client
    Ministère de l’Agriculture et de la Souveraineté alimentaire
    Funding
    World Bank
    Input (person-months)
    24
  14. Rural roads and bridges

    Recruitment of a firm to complete the control and supervision of rehabilitation works on 313.107 km of tracks and the construction of two (2) bridges in the Coyah, Boffa and Boké prefectures

    Period
    2026 Ongoing
    Country
    Guinea
    Client
    Ministère de l’Agriculture
    Funding
    IBRD (International Bank for Reconstruction and Development)
    Input (person-months)
    3
  15. Irrigation and lowland development

    Detailed technical, socio-economic, financial and environmental studies for full water control hydro-agricultural schemes covering a net area of 2,937 hectares in the municipality of Malanville

    Period
    2025 Ongoing
    Country
    Benin
    Client
    Société béninoise des aménagements agricoles (SoBAA SA)
    Funding
    Own budget (state grant)
    Input (person-months)
    33
  16. Buildings and other facilities

    Technical, architectural, environmental and social studies, and control and supervision of works for the construction of the teacher training institute (IFM) in Bamako, the extension of the Sikasso and Ségou IFMs and the rehabilitation of the Mopti IFM

    Period
    2025 Ongoing
    Country
    Mali
    Client
    Projet d’amélioration de la qualité et des résultats de l’éducation pour tous au Mali (MIQRA)
    Funding
    World Bank
    Input (person-months)
  17. Rural roads and bridges

    Preliminary design (APS) and detailed design (APD) studies and supervision of works for 32 km of tracks in the Oussouye and Ziguinchor departments

    Period
    2025 Ongoing
    Country
    Senegal
    Client
    Programme national de développement des agropoles du Sénégal
    Funding
    AfDB
    Input (person-months)
  18. Irrigation and lowland development

    Recruitment of a firm for technical studies for the construction of water infrastructure and the supervision of works

    Period
    2024 Ongoing
    Country
    Niger
    Client
    PCRSS-Niger
    Funding
    World Bank
    Input (person-months)
    125
  19. Drinking water and pastoral water supply

    Implementation of support measures for water/WASH projects in the Koro district, Mopti region

    Period
    2021 Ongoing
    Country
    Mali
    Client
    PROJES
    Funding
    GIZ Mali
    Input (person-months)
    98
  20. Irrigation and lowland development

    Consulting engineering services for detailed design (APD) studies, preparation of bidding documents (DAO), technical assistance to the administration in procurement, and control and supervision of works execution

    Period
    2020 Ongoing
    Country
    Togo
    Client
    Projet de développement rural de la plaine de l’Oti, zone 5
    Funding
    BOAD loan
    Input (person-months)
    107
  21. Irrigation and lowland development

    Consulting services for detailed technical studies and control and supervision of hydro-agricultural development works on 1,256 ha of irrigated schemes in the OHVN area (Figuiratomo-Selingué, Balanzan, Koursalé and Séguela) under the PRESAN-KL

    Period
    2016 Ongoing
    Country
    Mali
    Client
    AGETIER-Mali
    Funding
    GAFSP grant
    Input (person-months)
    144
  22. Drinking water and pastoral water supply

    Complementary studies and supervision of water works in the Matam, Tambacounda, Kédougou and Kolda regions

    Period
    2016 Ongoing
    Country
    Senegal
    Client
    AGETIP Sénégal
    Funding
    IsDB and WAEMU
    Input (person-months)
    157
  23. Buildings and other facilities

    Supervision of the construction of 1,432 social housing units in several towns across the country: lot 7, 52 social housing units in Tidjikdja, and lot 8, 308 social housing units in Kiffa

    Period
    2023 to 2025
    Country
    Mauritania
    Client
    Délégation générale Taazour
    Funding
    National budget
    Input (person-months)
  24. Rural roads and bridges

    Control and supervision of works for the opening, construction, rehabilitation, removal of critical points and routine mechanised maintenance of rural tracks in the 5 regions of Togo: mission 5, Savanes region

    Period
    2023 to 2025
    Country
    Togo
    Client
    Ministère du Désenclavement et des Pistes rurales, Direction des pistes rurales
    Funding
    BIE (2023 and 2024 budgets)
    Input (person-months)
    183
  25. Buildings and other facilities

    Environmental and social impact assessment (ESIA) for the Bancoumana agro-industrial park

    Period
    2024
    Country
    Mali
    Client
    AGROPOLE
    Funding
    AfDB
    Input (person-months)
  26. Irrigation and lowland development

    Integrated landscape management in the areas of the West Africa Food System Resilience Program (PRSA) in Sikasso

    Period
    2023 to 2024
    Country
    Mali
    Client
    PRSA-Mali
    Funding
    World Bank
    Input (person-months)
    42
  27. Irrigation and lowland development

    Preliminary design (APS) and detailed design (APD) studies and preparation of bidding documents (DAO) for the installation of teaching-oriented economic units at 30 agricultural technical high schools, for the development of 30,000 ha (lot 3 of 10,000 ha)

    Period
    2023 to 2024
    Country
    Benin
    Client
    Agence de développement de l’enseignement technique (ADET)
    Funding
    National budget
    Input (person-months)
    152
  28. Irrigation and lowland development

    Supervision and control of works for the construction/rehabilitation and equipment of eleven (11) banana packing and bunch-handling sheds, and equipment for eleven (11) economic interest groups (GIE) in the Tambacounda and Vélingara departments, in two lots: lot 1 and lot 2

    Period
    2023 to 2024
    Country
    Senegal
    Client
    Société de développement agricole et industrielle du Sénégal (SODAGRI)
    Funding
    World Bank
    Input (person-months)
    23
  29. Buildings and other facilities

    Preparation of bidding documents (DAO) and supervision of construction works for a processing and storage building and two 100 t warehouses in the Kayes and Sikasso regions (Amassa Afrique Verte Mali)

    Period
    2023 to 2024
    Country
    Mali
    Client
    AMASSA
    Funding
    WFP
    Input (person-months)
    3
  30. Buildings and other facilities

    Studies and control of works for socio-economic infrastructure projects in the Sédhiou region: lot 1

    Period
    2023 to 2024
    Country
    Senegal
    Client
    SODAGRI
    Funding
    World Bank
    Input (person-months)
  31. Irrigation and lowland development

    Recruitment of a consultant for feasibility studies, preliminary design (APS), detailed design (APD), bidding documents (DAO) and works supervision for five (5) lowland development sub-projects covering an estimated total of 540 ha in the Dioila (Togo, Konfon, Kaban, Woh) and Koulikoro (Mafeya) districts

    Period
    2022 to 2024
    Country
    Mali
    Client
    PARIIS-Mali
    Funding
    World Bank
    Input (person-months)
    45
  32. Irrigation and lowland development

    Studies for the development of 5,940 ha under controlled flooding, the Pekadouzou master plan over 20,000 ha, the consolidation of the Woloni plain (2,300 ha) with an option for conversion to full water control, the rehabilitation of PMB infrastructure and 65 km of tracks in the Bla-San area

    Period
    2022 to 2024
    Country
    Mali
    Client
    GIC
    Funding
    National budget
    Input (person-months)
    61
  33. Rural roads and bridges

    Preliminary design (APS), detailed design (APD) and bidding documents (DAO) for the construction of three (03) bridges (at Djoungoula, N’tiobougou and Faniena) in the Koulikoro and Sikasso regions

    Period
    2019 to 2024
    Country
    Mali
    Client
    Unité nationale de coordination du PAAR, ministère des Infrastructures et de l’Équipement
    Funding
    World Bank
    Input (person-months)
  34. Irrigation and lowland development

    Supervision and control of priority development works on 620 ha of lowlands in the Kolda, Tambacounda and Kédougou regions, in three lots: lot 1, lot 2 and lot 3

    Period
    2023
    Country
    Senegal
    Client
    Société de développement agricole et industrielle du Sénégal (SODAGRI)
    Funding
    World Bank
    Input (person-months)
    22
  35. Rural roads and bridges

    Technical studies and supervision of construction works for a bridge and access roads at Dekorobougou serving the rural municipalities of Zaniéna, Nièna and Mininko (Sikasso district) and Kolosso (Kolondieba district), linking the Sikasso and Kolondieba districts

    Period
    2023
    Country
    Mali
    Client
    PROJES
    Funding
    GIZ Mali
    Input (person-months)
    43
  36. Irrigation and lowland development

    Recruitment of a consultant to carry out three (03) environmental and social impact assessments for the development works at the Togo, Konfon and Woh sites in the Dioïla district

    Period
    2022 to 2023
    Country
    Mali
    Client
    PARIIS-Mali
    Funding
    World Bank
    Input (person-months)
    4
  37. Irrigation and lowland development

    Studies and supervision of construction and development works (4 boreholes, 1 pond and 2 lowlands) on behalf of the beneficiaries in the Nioro du Sahel region

    Period
    2022 to 2023
    Country
    Mali
    Client
    PAM, à travers AMASSA-OMADEZA
    Funding
    WFP
    Input (person-months)
    41.9
  38. Irrigation and lowland development

    Supervision and control of development works for the Dogobala lowland dam, Tiemala Banimonotié municipality, Bougouni district and region, lot 4

    Period
    2022 to 2023
    Country
    Mali
    Client
    Conseil régional de Sikasso
    Funding
    Sikasso Regional Council budget (Danish cooperation funds)
    Input (person-months)
    13
  39. Irrigation and lowland development

    Environmental and social impact assessments for six (6) second-generation PARIIS Mali sub-projects (Tiessoula, Tiengola, Senou, Missango, Tingolé and Dantia)

    Period
    2022 to 2023
    Country
    Mali
    Client
    PARIIS
    Funding
    World Bank
    Input (person-months)
    2.35
  40. Drinking water and pastoral water supply

    Supervision of works for 22 drinking water supply systems in 16 villages and 6 health centres in the Sikasso, Bougouni and Koutiala regions, in five (5) lots

    Period
    2022 to 2023
    Country
    Mali
    Client
    Conseil régional de Sikasso
    Funding
    Danish cooperation
    Input (person-months)
    20
  41. Irrigation and lowland development

    Control and supervision of works in the regions of Bamako, Kayes, Koulikoro, Ségou, Nioro, Bougouni and Sikasso on behalf of the STF/DNSA, as part of the implementation of the PDMO 2022 ARC/Mali

    Period
    2022
    Country
    Mali
    Client
    Commissariat à la sécurité alimentaire, à travers le Secrétariat technique et financier
    Funding
    WFP
    Input (person-months)
    39
  42. Irrigation and lowland development

    Environmental and social impact assessments (ESIA) for the construction of marketing infrastructure in the Kayes region

    Period
    2021 to 2022
    Country
    Mali
    Client
    PDAZAM
    Funding
    World Bank
    Input (person-months)
    7.7
  43. Irrigation and lowland development

    Control and supervision of rehabilitation works on a first tranche of the flood-recession farming area in the Lake Horo schemes

    Period
    2021 to 2022
    Country
    Mali
    Client
    Conseil régional de Tombouctou
    Funding
    AFD (French Development Agency)
    Input (person-months)
    11
  44. Rural roads and bridges

    Detailed technical studies, preliminary design and detailed design for the maintenance, removal of critical points, rehabilitation, opening and construction of rural tracks: mission 4

    Period
    2021 to 2022
    Country
    Togo
    Client
    Ministère du Désenclavement et des Pistes rurales, Direction des pistes rurales
    Funding
    BIE (2021 budget) and SAFER 2021
    Input (person-months)
    35.5
  45. Rural roads and bridges

    Detailed design studies, technical specifications, and control and supervision of rehabilitation/construction works for 67 km of access tracks and 93.68 km of feeder roads identified in 2013

    Period
    2020 to 2022
    Country
    Togo
    Client
    Ministère de l’Agriculture, de la Production animale et halieutique
    Funding
    EBID loan
    Input (person-months)
    44
  46. Drinking water and pastoral water supply

    Support mission, on behalf of PROJES, for the beneficiaries of socio-economic infrastructure built in the Ségou and Mopti regions, lot 2 (Mopti)

    Period
    2021
    Country
    Mali
    Client
    PROJES
    Funding
    GIZ Mali
    Input (person-months)
    54
  47. Irrigation and lowland development

    Supervision of consolidation works on village irrigated perimeters (PIV) under phase 1 of the PGIRE in the Kayes district (lot 01)

    Period
    2020 to 2021
    Country
    Mali
    Client
    Agence de développement rural de la vallée du fleuve Sénégal (ADRS)
    Funding
    World Bank
    Input (person-months)
    10
  48. Integrated projects

    Electrification works using hybrid systems (solar PV and diesel thermal), distribution network and connections for the town of Rharous, Gourma Rharous district, Tombouctou region

    Period
    2019 to 2021
    Country
    Mali
    Client
    AGETIPE-Mali
    Funding
    World Bank
    Input (person-months)
    38
  49. Irrigation and lowland development

    Technical, economic and environmental studies, and control and supervision of development works for a 25 ha market-gardening scheme in Ansongo, Ansongo municipality and district

    Period
    2020
    Country
    Mali
    Client
    SOS Sahel
    Funding
    IDA
    Input (person-months)
    11
  50. Irrigation and lowland development

    Detailed design studies for the development of 353 ha of lowlands in the Kara region

    Period
    2019 to 2020
    Country
    Togo
    Client
    Projet d’appui au développement agricole au Togo (PADAT)
    Funding
    BOAD loan
    Input (person-months)
    13
  51. Irrigation and lowland development

    Technical, environmental and socio-economic studies based on the value-chain approach, and control and supervision of rehabilitation works on the Sindiwara irrigated scheme

    Period
    2019 to 2020
    Country
    Mali
    Client
    SOS Sahel
    Funding
    IDA
    Input (person-months)
    8
  52. Irrigation and lowland development

    Studies, control and supervision of development works for 4,000 ha of new valleys in the Sédhiou and Kolda regions

    Period
    2017 to 2020
    Country
    Senegal
    Client
    PAPSEN
    Funding
    Senegal-Italy concessional loan
    Input (person-months)
    128
  53. Rural roads and bridges

    Control and supervision of works on the Soukourale-Oure and Oure-Biko tracks in Keleya municipality, Bougouni district, Sikasso region

    Period
    2019
    Country
    Mali
    Client
    IPRO-IRRIGAR Sikasso
    Funding
    Federal Republic of Germany
    Input (person-months)
    12
  54. Irrigation and lowland development

    Detailed design studies, preparation of bidding documents (DAO) and ESIA for the development of 910 hectares of lowlands validated in 2013 in the Central Region

    Period
    2018 to 2019
    Country
    Togo
    Client
    PADAT
    Funding
    BOAD (West African Development Bank)
    Input (person-months)
    34.5
  55. Drinking water and pastoral water supply

    Detailed design (APD), bidding documents (DAO) and supervision of works for the construction of 8 boreholes and the rehabilitation of 2 boreholes in the Saint-Louis, Matam and Louga regions

    Period
    2017 to 2019
    Country
    Senegal
    Client
    PRAPS/MEPA
    Funding
    World Bank
    Input (person-months)
    52
  56. Irrigation and lowland development

    Consulting services for development studies of 10,000 ha of agro-pastoral plains on the right bank of the Niger in the Djenné district

    Period
    2015 to 2019
    Country
    Mali
    Client
    AGETIER-Mali
    Funding
    National funding (loan)
    Input (person-months)
    24
  57. Irrigation and lowland development

    Control and supervision of construction works for hydro-agricultural structures in the village of Zana, Sirakorola rural municipality, Koulikoro district, lot 3 (rehabilitation of the Zana submersible weir)

    Period
    2018
    Country
    Mali
    Client
    IPRO-REAGIR Koulikoro
    Funding
    Global Affairs Canada and KfW
    Input (person-months)
    6.25
  58. Irrigation and lowland development

    Technical and environmental studies for planned agricultural development zones (ZAAP) under the community development programme (PUDC)

    Period
    2018
    Country
    Togo
    Client
    PUDC-Togo
    Funding
    UNDP
    Input (person-months)
    6
  59. Rural roads and bridges

    Final detailed design (APD) technical studies for 700 km of tracks and crossing structures under the Kaarta/Séféto integrated development project, Kita district, Kayes region, phase I

    Period
    2018
    Country
    Mali
    Client
    ADRS
    Funding
    National budget
    Input (person-months)
    48
  60. Irrigation and lowland development

    Update of the detailed design of development works for the Dori river basin Dredging, Sanitation and Development project (DRABHID)

    Period
    2017 to 2018
    Country
    Burkina Faso
    Client
    Ministère de l’Agriculture et des Aménagements hydrauliques
    Funding
    Governments of Italy and Burkina Faso (memorandum of understanding)
    Input (person-months)
    19.5
  61. Drinking water and pastoral water supply

    Studies and supervision of construction works for 58 hand pumps (PMH) and 04 basic water supply systems (AES), and rehabilitation of 02 hand pumps, in the Ségou region, Niono district

    Period
    2017 to 2018
    Country
    Mali
    Client
    PRRE/AGETIER-Mali
    Funding
    World Bank
    Input (person-months)
    48
  62. Rural roads and bridges

    Study of rural tracks (315 km) in the Kara region under the community development programme (PUDC)

    Period
    2017 to 2018
    Country
    Togo
    Client
    PUDC
    Funding
    UNDP
    Input (person-months)
    36
  63. Paved roads and urban streets

    Preliminary design (APS) and detailed design (APD) studies for the Bamako outer ring road: RN3 (Nosombougou)-Dabani-Safo-RN27-3rd Bamako bridge-RN6-Sirakoro Méguétana-RN7 link and the Banconi-Dialakorodji-Safo spur, approximately 90 km in total

    Period
    2017 to 2018
    Country
    Mali
    Client
    Ministère de l’Équipement, des Transports et du Désenclavement
    Funding
    National budget
    Input (person-months)
    127
  64. Paved roads and urban streets

    Control and supervision of construction and paving works on the Baraoueli-Tamani road (30.6 km)

    Period
    2017 to 2018
    Country
    Mali
    Client
    Ministère des Transports et des Infrastructures routières
    Funding
    National budget
    Input (person-months)
    116
  65. Irrigation and lowland development

    Detailed design (APD) and supervision of works for a multi-village drinking water supply system (AEP-MV) and drip-irrigation hydro-agricultural development, as part of a study and supervision of multi-purpose water development for food security around the deep artesian borehole, Kourinion municipality, Hauts-Bassins region

    Period
    2016 to 2018
    Country
    Burkina Faso
    Client
    AGETEER
    Funding
    WAEMU
    Input (person-months)
    17
  66. Paved roads and urban streets

    Control and supervision of works to upgrade the Bamako-Koulikoro road to 2x2 lanes (45 km)

    Period
    2016 to 2018
    Country
    Mali
    Client
    Ministère de l’Équipement, des Transports et du Désenclavement
    Funding
    BOAD (77.62%) and national budget (22.38%)
    Input (person-months)
    230
  67. Irrigation and lowland development

    Control and supervision of rehabilitation works on micro-dams in three villages of the Kati district, Koulikoro region, 2016-2017 season: lot 2, Fadiobougou lowlands (Kati district)

    Period
    2017
    Country
    Mali
    Client
    IPRO-REAGIR Antenne de Ouéléssébougou
    Funding
    Global Affairs Canada and KfW
    Input (person-months)
    5.33
  68. Drinking water and pastoral water supply

    Preliminary design (APS), detailed design (APD) and bidding documents (DAO) for tracks (160 km), 12 crossing structures, 3 drinking water supply systems and 27 village water systems (SHVA) in Kaarta/Séféto, Kita district, Kayes region: phase I

    Period
    2017
    Country
    Mali
    Client
    ADRS
    Funding
    National budget
    Input (person-months)
    28
  69. Irrigation and lowland development

    Detailed design (APD), bidding documents (DAO) and supervision of construction works for 10 pastoral ponds

    Period
    2016 to 2017
    Country
    Senegal
    Client
    PRAPS/MEPA
    Funding
    World Bank
    Input (person-months)
    11
  70. Irrigation and lowland development

    Control and supervision of development works for 500 hectares of agro-sylvo-pastoral and fisheries schemes in Togo: mission 2, Agbandi, Koutoukpa and Gapé-Kpodji sites

    Period
    2016 to 2017
    Country
    Togo
    Client
    AGETUR-Togo
    Funding
    WAEMU
    Input (person-months)
    85
  71. Irrigation and lowland development

    Control and supervision of development works for 500 hectares of agro-sylvo-pastoral and fisheries schemes in Togo: mission 1, Sadori and Possoa sites

    Period
    2016 to 2017
    Country
    Togo
    Client
    AGETUR-Togo
    Funding
    WAEMU
    Input (person-months)
    61
  72. Paved roads and urban streets

    Control and supervision of development works on the urban section of the Banamba-Touba road

    Period
    2016
    Country
    Mali
    Client
    Ministère des Transports et des Infrastructures routières
    Funding
    National budget
    Input (person-months)
    72
  73. Irrigation and lowland development

    Technical studies (APS/APD/DAO) and supervision of marking works on the pastoral track between Bla and San in the Ségou region

    Period
    2015 to 2016
    Country
    Mali
    Client
    AGETIER-Mali
    Funding
    Kingdom of Denmark
    Input (person-months)
    13
  74. Irrigation and lowland development

    Detailed design study and technical specifications for the development of 697 hectares of lowlands validated in 2012 in the Kara (Dankpen prefecture) and Savanes regions of Togo

    Period
    2015 to 2016
    Country
    Togo
    Client
    Projet d’appui au développement agricole au Togo (PADAT)
    Funding
    GAFSP grant
    Input (person-months)
    21.75
  75. Buildings and other facilities

    Detailed design technical studies, and control and supervision of warehouse construction works in Kita (CMDT Filiale Ouest SA)

    Period
    2015 to 2016
    Country
    Mali
    Client
    CMDT
    Funding
    CMDT
    Input (person-months)
    12
  76. Integrated projects

    Project management for the design and supervision of hydro-agricultural infrastructure on behalf of the PADAER in the Kédougou region, Senegal

    Period
    2015 to 2016
    Country
    Senegal
    Client
    Programme d’appui au développement agricole et à l’entrepreneuriat rural (PADAER)
    Funding
    IFAD (International Fund for Agricultural Development)
    Input (person-months)
    70
  77. Paved roads and urban streets

    Control and supervision of works on urban roads and drainage structures in Commune II of the Bamako District

    Period
    2015 to 2016
    Country
    Mali
    Client
    Mairie du district de Bamako
    Funding
    AFD (French Development Agency)
    Input (person-months)
    6
  78. Drinking water and pastoral water supply

    Detailed technical studies for drinking water supply and sanitation in the Gao, Koulikoro and Ségou regions; social intermediation in the Ségou region, Ségou and Baraoueli districts

    Period
    2010 to 2016
    Country
    Mali
    Client
    Ministère de l’Énergie et de l’Eau
    Funding
    ADF (African Development Fund)
    Input (person-months)
    103
  79. Irrigation and lowland development

    Detailed design (APD) studies and preparation of bidding documents for the development of twenty-two (22) lowlands in the Kayes region, under the PAPAM small-scale irrigation project

    Period
    2015
    Country
    Mali
    Client
    AGETIER-Mali (PAPAM)
    Funding
    IFAD (International Fund for Agricultural Development)
    Input (person-months)
    28
  80. Irrigation and lowland development

    Control and supervision of development works for ten (10) small market-gardening schemes in the Koulikoro region, under the PAPAM small-scale irrigation project

    Period
    2015
    Country
    Mali
    Client
    AGETIER-Mali (PAPAM)
    Funding
    IFAD (International Fund for Agricultural Development)
    Input (person-months)
    5
  81. Irrigation and lowland development

    Control and supervision of development works on the Kadjila plain and the Molasso lowland, Sikasso district and region

    Period
    2015
    Country
    Mali
    Client
    IPROSI
    Funding
    EU and German cooperation (KfW)
    Input (person-months)
    28
  82. Dams and small hydropower

    Control and supervision of rehabilitation works on eight (08) micro-dams in the Kayes region, under the PAPAM small-scale irrigation project

    Period
    2015
    Country
    Mali
    Client
    AGETIER-Mali
    Funding
    IFAD (International Fund for Agricultural Development)
    Input (person-months)
    12
  83. Integrated projects

    Supervision and control of works: rehabilitation of sectors 1, 2, 3 and 5 of the developed scheme (3,180 ha) and maintenance of the Anambé basin dams; installation of hydromechanical equipment, electrification and maintenance of pumping stations and dams; development of 200 ha of small irrigated schemes in the valleys of the Sinthiang Koundara, Bonconto and Wassadou rural communities (Vélingara department, Kolda region)

    Period
    2015
    Country
    Senegal
    Client
    Société de développement agricole et industrielle du Sénégal (SODAGRI)
    Funding
    World Bank and Spanish cooperation
    Input (person-months)
    58
  84. Drinking water and pastoral water supply

    Control and supervision of rehabilitation works on 23 mini drinking water (AEP) and basic water supply (AES) networks in the Ségou, Mopti, Tombouctou, Gao and Kidal regions

    Period
    2015
    Country
    Mali
    Client
    UNICEF
    Funding
    UNICEF
    Input (person-months)
    24
  85. Buildings and other facilities

    Technical studies, and control and supervision of construction works for twenty-four (24) school facilities in the Maritime region (Lomé, Golfe)

    Period
    2014 to 2015
    Country
    Togo
    Client
    AGETUR-Togo
    Funding
    World Bank
    Input (person-months)
  86. Drinking water and pastoral water supply

    Technical studies, and control and supervision of works for the Living Environment Improvement Project in selected neighbourhoods of Communes II, III, IV, V and VI

    Period
    2014 to 2015
    Country
    Mali
    Client
    AGETIPE-Mali
    Funding
    National budget
    Input (person-months)
    8
  87. Irrigation and lowland development

    Hydro-agricultural and fisheries development studies for 600 hectares in the Centre-Nord region

    Period
    2013 to 2015
    Country
    Burkina Faso
    Client
    AGETEER
    Funding
    WAEMU
    Input (person-months)
    22
  88. Integrated projects

    Studies, and control and supervision of works for the Mô Plain Integrated Rural Development Project (PDRI-Mô): development of 5 lowlands and 3 planned agricultural development zones (ZAAP) with access tracks, 61 successful boreholes and 5 basic water supply systems

    Period
    2012 to 2015
    Country
    Togo
    Client
    Ministère délégué auprès du ministre de l’Agriculture, de l’Élevage et de la Pêche, chargé des Infrastructures rurales
    Funding
    BOAD (West African Development Bank)
    Input (person-months)
    10
  89. Rural roads and bridges

    Detailed studies, preparation of bidding documents (DAO), and control and supervision of rural track works in the Mô plain

    Period
    2012 to 2015
    Country
    Togo
    Client
    Ministère délégué auprès du ministre de l’Agriculture, de l’Élevage et de la Pêche, chargé des Infrastructures rurales
    Funding
    BOAD (West African Development Bank)
    Input (person-months)
    41
  90. Irrigation and lowland development

    Technical studies for the 200 ha extension of the Saoune plain in Diré

    Period
    2014
    Country
    Mali
    Client
    Direction nationale du génie rural, pour le ministère du Développement rural
    Funding
    National funding
    Input (person-months)
    18
  91. Irrigation and lowland development

    Impact assessment and social mobilisation for the implementation and management of fish-farming schemes in the Koutiala, Yorosso, Sikasso, Kadiolo and Yanfolila districts

    Period
    2014
    Country
    Mali
    Client
    Projet de développement de la filière aquacole (PRODEFA)
    Funding
    PRODEFA (100%)
    Input (person-months)
    8
  92. Paved roads and urban streets

    Detailed design (APD) technical studies, and control and supervision of works on the access road to the CMDT plants in Sikasso

    Period
    2014
    Country
    Mali
    Client
    Compagnie malienne pour le développement des textiles (CMDT)
    Funding
    CMDT
    Input (person-months)
    7.5
  93. Integrated projects

    Services for the control and supervision of micro-project works in the Kayes region

    Period
    2013 to 2014
    Country
    Mali
    Client
    PADEC
    Funding
    National budget
    Input (person-months)
    46
  94. Paved roads and urban streets

    Services for detailed design (APD) studies and bidding documents (DAO) for urban roads and drainage structures in Commune II of the Bamako District

    Period
    2013 to 2014
    Country
    Mali
    Client
    Mairie du district de Bamako
    Funding
    AFD (French Development Agency)
    Input (person-months)
    15
  95. Irrigation and lowland development

    Supervision of works for semi-Californian irrigation schemes in the Boucle du Mouhoun, Hauts-Bassins, Centre-Nord, Nord, Plateau Central and Sud-Ouest regions (lot 1)

    Period
    2012 to 2014
    Country
    Burkina Faso
    Client
    AGETEER
    Funding
    National funding
    Input (person-months)
    12
  96. Integrated projects

    Studies, and control and supervision of hydro-agricultural development works for the Kara Region Rice Production Development Project (PDPR-K)

    Period
    2012 to 2014
    Country
    Togo
    Client
    Ministère délégué auprès du ministre de l’Agriculture, de l’Élevage et de la Pêche, chargé des Infrastructures rurales
    Funding
    BADEA and national budget
    Input (person-months)
    143
  97. Paved roads and urban streets

    Control and supervision of construction and paving works on the Banamba road (RN27-Touba link), 13.53 km

    Period
    2012 to 2014
    Country
    Mali
    Client
    Ministère des Transports et des Infrastructures routières
    Funding
    National budget
    Input (person-months)
    45
  98. Dams and small hydropower

    Update study and supervision of construction works for the Wabessan dam, Sissili province, Centre-Ouest region

    Period
    2012 to 2013
    Country
    Burkina Faso
    Client
    AGETEER
    Funding
    Burkina Faso state budget
    Input (person-months)
    64
  99. Dams and small hydropower

    Update study and supervision of construction works for the Sarre dam, Kombissiri municipality, Bazega province, Centre-Sud region

    Period
    2012 to 2013
    Country
    Burkina Faso
    Client
    AGETEER
    Funding
    Burkina Faso state budget
    Input (person-months)
    54
  100. Drinking water and pastoral water supply

    Studies, siting and supervision of works for successful boreholes equipped with hand pumps (PMH), village water systems (SHVA), basic water supply systems (AES) and cistern wells, and construction of modern wells in the Koulikoro region

    Period
    2011 to 2013
    Country
    Mali
    Client
    Ministère de l’Énergie et de l’Eau
    Funding
    ADF (African Development Fund)
    Input (person-months)
    52
  101. Buildings and other facilities

    Technical studies, and control and supervision of construction and rehabilitation works for infrastructure at the Madina Diassa centres: 6 slaughter areas, 3 mini-dairies, 5 livestock markets and a 70 km track in the PROGEBE intervention area

    Period
    2010 to 2013
    Country
    Mali
    Client
    PROGEBE
    Funding
    ADF (African Development Fund)
    Input (person-months)
    35
  102. Buildings and other facilities

    Technical studies, and control and supervision of construction and rehabilitation works for the buildings of the MEP decentralised services and livestock infrastructure in the Kayes area on behalf of the PADEPA-KS

    Period
    2010 to 2013
    Country
    Mali
    Client
    PADEPA-KS
    Funding
    ADF (African Development Fund)
    Input (person-months)
    45
  103. Drinking water and pastoral water supply

    Technical project management for the rehabilitation of two hundred (200) boreholes in the Boucle du Mouhoun region (lot 1)

    Period
    2012
    Country
    Burkina Faso
    Client
    AGETEER
    Funding
    Burkina Faso state budget
    Input (person-months)
    33
  104. Rural roads and bridges

    Detailed design (APD), bidding documents (DAO), and control and supervision of track rehabilitation and crossing structure construction works in the Koulikoro region

    Period
    2012
    Country
    Mali
    Client
    CTB Mali
    Funding
    BTC (Belgian Development Agency)
    Input (person-months)
    15
  105. Drinking water and pastoral water supply

    Studies and supervision of works for three (3) large-diameter wells in the villages of Ama, Oualam and Dendya and two (02) cistern wells in the villages of Koumbena and Bounty, Douentza district, Mopti region

    Period
    2011 to 2012
    Country
    Mali
    Client
    CRS
    Funding
    USAID (Office of Food for Peace)
    Input (person-months)
    10
  106. Drinking water and pastoral water supply

    Technical studies and supervision of water supply works for the social housing sites in the Sikasso region (Bougouni and Koutiala), lot 3

    Period
    2011 to 2012
    Country
    Mali
    Client
    Ministère de l’Urbanisme et de l’Habitat
    Funding
    National budget
    Input (person-months)
    31
  107. Rural roads and bridges

    Preparation of construction drawings for the Macina-Diafarabé road (43.7 km)

    Period
    2011 to 2012
    Country
    Mali
    Client
    CGGC
    Funding
    National budget
    Input (person-months)
  108. Irrigation and lowland development

    Control and supervision of works on seventeen (17) village irrigated perimeters (PIV) in the Bourem and Gourma-Rharous districts, lots 1 and 2

    Period
    2010 to 2012
    Country
    Mali
    Client
    Commissariat à la sécurité alimentaire
    Funding
    IFAD (International Fund for Agricultural Development)
    Input (person-months)
    12
  109. Integrated projects

    Services for the control and supervision of micro-project works in the Kayes region

    Period
    2010 to 2012
    Country
    Mali
    Client
    PADEC
    Funding
    ADF (African Development Fund)
    Input (person-months)
    123
  110. Rural roads and bridges

    Technical studies (including socio-economic impact studies), and control and supervision of works for 130 km of rural tracks in the Kayes Sud area on behalf of the PADEPA-KS

    Period
    2009 to 2012
    Country
    Mali
    Client
    PADEPA-KS
    Funding
    ADF (African Development Fund)
    Input (person-months)
    34
  111. Irrigation and lowland development

    Control and supervision of development works on the Tomina plain

    Period
    2011
    Country
    Mali
    Client
    CARE International au Mali
    Funding
    CARE Mali
    Input (person-months)
    15
  112. Irrigation and lowland development

    Topographic surveys and development studies for the Tomina plain

    Period
    2011
    Country
    Mali
    Client
    CARE International au Mali
    Funding
    CARE Mali
    Input (person-months)
    6
  113. Integrated projects

    Detailed technical studies (geophysical borehole siting) and supervision of works for 15 boreholes, 10 village wells and 10 cistern wells on behalf of the Livestock Development Support Project in North-East Mali (PADENEM, phase II), Gao (amendment)

    Period
    2011
    Country
    Mali
    Client
    PADENEM
    Funding
    ADF (African Development Fund)
    Input (person-months)
    20
  114. Rural roads and bridges

    Control and supervision of works on link tracks between the villages on the right bank of the main canal of the Baguinéda irrigated scheme

    Period
    2011
    Country
    Mali
    Client
    Office du périmètre irrigué de Baguinéda (ministère de l’Agriculture)
    Funding
    National budget
    Input (person-months)
    15
  115. Drinking water and pastoral water supply

    Detailed technical studies, and control and supervision of works for 150 MFT boreholes equipped with hand pumps in the Matam, Tambacounda and Kédougou regions, within the UEMOA area

    Period
    2009 to 2011
    Country
    Senegal
    Client
    AGETIP Sénégal
    Funding
    WAEMU
    Input (person-months)
    103
  116. Drinking water and pastoral water supply

    Feasibility studies for 25 village water supply systems (AEV) from boreholes in the Atlantique department, under the rural drinking water supply (AEP) and sanitation programme (PAEPA) financed by the BAD

    Period
    2009 to 2011
    Country
    Benin
    Client
    Ministère de l’Énergie et de l’Eau (Bénin)
    Funding
    ADF (African Development Fund)
    Input (person-months)
    25
  117. Integrated projects

    Studies, supervision and capacity building for the Livestock Development Support Project in North-East Mali, phase II (PADENEM): integrated project covering studies and control and supervision of village and pastoral water works (25 boreholes, 40 companion wells, 10 solar stations, 50 km of track), rehabilitation of 30 pastoral wells and deepening of 15 ponds in the Gao region and Gossi municipality

    Period
    2007 to 2011
    Country
    Mali
    Client
    PADENEM
    Funding
    ADF (African Development Fund)
    Input (person-months)
    103
  118. Irrigation and lowland development

    Detailed design (APD), preparation of bidding documents (DAO), and control and supervision of works for the development of lowlands, ponds, floodplains and market-gardening schemes in the Kayes, Koulikoro, Sikasso, Ségou and Gao regions, in five lots: lot 5, Gao

    Period
    2010
    Country
    Mali
    Client
    Ministère de l’Agriculture
    Funding
    National budget
    Input (person-months)
    10
  119. Irrigation and lowland development

    Detailed design studies and preparation of the contractors’ consultation file for the deepening of the Mayel channel

    Period
    2010
    Country
    Mali
    Client
    FODESA
    Funding
    IFAD (International Fund for Agricultural Development)
    Input (person-months)
    10
  120. Irrigation and lowland development

    Detailed design technical studies, including the pumping station, and control and supervision of the main canal of the N’Gorfondou scheme in the Diré district, Tombouctou region

    Period
    2010
    Country
    Mali
    Client
    Initiatives intégrées pour la croissance économique au Mali (IICEM)
    Funding
    USAID
    Input (person-months)
    28
  121. Irrigation and lowland development

    Detailed design technical studies, including the pumping station, for the 500 ha scheme at Lake Horo with a 14 km irrigation canal divided into two 7 km lots, and control and supervision of works

    Period
    2010
    Country
    Mali
    Client
    Initiatives intégrées pour la croissance économique au Mali (IICEM)
    Funding
    USAID
    Input (person-months)
    38
  122. Dams and small hydropower

    Technical pre-feasibility studies for the Bily micro power plant in the Kayes region

    Period
    2010
    Country
    Mali
    Client
    Ministère de l’Énergie, des Mines et de l’Eau
    Funding
    World Bank (IDA)
    Input (person-months)
    10
  123. Irrigation and lowland development

    Control and supervision of works on the Mopti Nord medium-sized scheme (200 ha) on behalf of the Office Riz Mopti through the Mopti Region Rural Development Support Programme (PADER)

    Period
    2009 to 2010
    Country
    Mali
    Client
    AGETIER pour le compte de PADER/ORM
    Funding
    Special investment budget
    Input (person-months)
    10
  124. Buildings and other facilities

    Architectural and technical studies (APS, APD, DAO) and supervision of construction works for the Ténenkou high school in the Mopti region, subcontracted with SETEM-Bénin

    Period
    2008 to 2010
    Country
    Mali
    Client
    AGETIPE-Mali
    Funding
    World Bank
    Input (person-months)
    4.5
  125. Irrigation and lowland development

    Technical studies, including pumping stations, and control and supervision of hydro-agricultural development works (village irrigated perimeters) in Kabara, Tonka, Kondi, Kessoubibi, Nianfunké, Sibo, Adina Koira, Findoukaina and Bagadadji, Tombouctou region

    Period
    2009
    Country
    Mali
    Client
    Initiatives intégrées pour la croissance économique au Mali (IICEM)
    Funding
    USAID
    Input (person-months)
    48
  126. Irrigation and lowland development

    Technical studies (baseline studies, detailed design and bidding documents) for the development of the Banamakan Ontongolo floodplain in the Yélimané district, Kayes region

    Period
    2009
    Country
    Mali
    Client
    FAO (Organisation des Nations unies pour l’alimentation et l’agriculture)
    Funding
    FAO
    Input (person-months)
    10
  127. Rural roads and bridges

    Technical studies for the construction of the Tofassadaga bridge and its access roads in the Kita district

    Period
    2009
    Country
    Mali
    Client
    AGETIPE-Mali
    Funding
    National budget
    Input (person-months)
    1
  128. Rural roads and bridges

    Technical studies for the construction of the Wassala bridge in the Bafoulabé district

    Period
    2009
    Country
    Mali
    Client
    AGETIPE-Mali
    Funding
    National budget
    Input (person-months)
    12
  129. Paved roads and urban streets

    Detailed design (APD) studies with bidding documents (DAO) for the construction of the roads linking Bamako’s third bridge to the RN6 (Ségou road) and the RN27 (Koulikoro road)

    Period
    2009
    Country
    Mali
    Client
    Ministère de l’Équipement et des Transports
    Funding
    National budget
    Input (person-months)
    2
  130. Irrigation and lowland development

    Development studies for the Neima small village irrigated perimeter, including the pumping station, in the Office Riz Mopti area

    Period
    2008 to 2009
    Country
    Mali
    Client
    Office Riz Mopti
    Funding
    National budget
    Input (person-months)
    24
  131. Rural roads and bridges

    Technical studies for link tracks (100 km) between the villages on the right bank of the main canal of the Baguinéda irrigated scheme

    Period
    2008 to 2009
    Country
    Mali
    Client
    Office du périmètre irrigué de Baguinéda
    Funding
    National budget
    Input (person-months)
    18
  132. Irrigation and lowland development

    Technical studies and supervision under the PADL project (integrated project), including assessment, facilitation and oversight of development works for basins and lowlands and the restoration of degraded land in the PADL-DIFFA intervention area

    Period
    2006 to 2009
    Country
    Niger
    Client
    Ministère de l’Hydraulique
    Funding
    AfDB
    Input (person-months)
    20
  133. Dams and small hydropower

    Technical feasibility studies for the Farako1 micro hydropower plant in the Sikasso region

    Period
    2008
    Country
    Mali
    Client
    Ministère de l’Énergie, des Mines et de l’Eau
    Funding
    National budget
    Input (person-months)
    25
  134. Irrigation and lowland development

    Technical studies, and control and supervision of development works for market-gardening schemes in the villages of Baraouli and Kalankabougou (Baraouli district), Boukiwèrè (Macina district), Doucouninkoro, Yolo and Tio (Ségou district) and Pouré (Tominian district)

    Period
    2007
    Country
    Mali
    Client
    DNGR
    Funding
    National budget
    Input (person-months)
    14
  135. Irrigation and lowland development

    Complete studies of the pastoral basins of Ibétemi (350 ha), Soufouroulaye-Diabi (1,350 ha) and Karbaye (900 ha)

    Period
    2007
    Country
    Mali
    Client
    PADER Mopti
    Funding
    ADF (African Development Fund)
    Input (person-months)
    16
  136. Irrigation and lowland development

    Studies for the upgrading of small village irrigated perimeters (PPIV) on behalf of the Mopti Region Rural Development Support Project

    Period
    2007
    Country
    Mali
    Client
    PADER Mopti
    Funding
    ADF (African Development Fund)
    Input (person-months)
    24
  137. Irrigation and lowland development

    Technical studies, and control and supervision of development works on 60 ha of the Guéléba plain, Kati district

    Period
    2007
    Country
    Mali
    Client
    AGETIER
    Funding
    National budget
    Input (person-months)
    32
  138. Irrigation and lowland development

    Technical studies, and control and supervision of development works on 60 ha of the Kéniégué plain, Kati district

    Period
    2007
    Country
    Mali
    Client
    AGETIER
    Funding
    National budget
    Input (person-months)
    32
  139. Irrigation and lowland development

    Supervision of additional works on the Koumouna hydro-agricultural scheme in the Office du Niger area

    Period
    2006 to 2007
    Country
    Mali
    Client
    AGETIER
    Funding
    National budget
    Input (person-months)
    9
  140. Buildings and other facilities

    Technical studies, and control and supervision of works for the FM radio stations in Koulikoro, Gao and Tombouctou

    Period
    2006 to 2007
    Country
    Mali
    Client
    Ministère de la Communication et des Nouvelles technologies (BTESA)
    Funding
    Spanish funds
    Input (person-months)
    24
  141. Drinking water and pastoral water supply

    Technical studies and supervision of water supply works for the sites of 120 social housing units (2006 tranche) in Sikasso

    Period
    2006 to 2007
    Country
    Mali
    Client
    Ministère de l’Habitat et de l’Urbanisme
    Funding
    National budget
    Input (person-months)
    32
  142. Drinking water and pastoral water supply

    Technical studies and supervision of water supply works for the sites of 30 social housing units (2006 tranche) in Koutiala

    Period
    2006 to 2007
    Country
    Mali
    Client
    Ministère de l’Habitat et de l’Urbanisme
    Funding
    National budget
    Input (person-months)
    32
  143. Paved roads and urban streets

    Technical studies and supervision of road, stormwater and wastewater drainage works for the social housing in Sikasso and Koutiala

    Period
    2006 to 2007
    Country
    Mali
    Client
    Ministère de l’Urbanisme et de l’Habitat
    Funding
    National budget and OMH
    Input (person-months)
    5
  144. Paved roads and urban streets

    Studies and supervision of routine maintenance and paving works on roads in the Ségou region (second half of 2006) for the Ségou Regional Roads Directorate

    Period
    2006 to 2007
    Country
    Mali
    Client
    AGEROUTE-Mali
    Funding
    Road authority
    Input (person-months)
    12
  145. Rural roads and bridges

    Technical studies and supervision of construction works for a 50 m span girder bridge at Siraninkoto, Djidian municipality, Kita district

    Period
    2005 to 2006
    Country
    Mali
    Client
    AGETIPE-Mali
    Funding
    National budget
    Input (person-months)
    12
  146. Paved roads and urban streets

    Technical studies, and control and supervision of sanitation and paving works on street 466 in Badialan I, Commune III of the Bamako District

    Period
    2005 to 2006
    Country
    Mali
    Client
    APEJ-Mali
    Funding
    APEJ
    Input (person-months)
    1
  147. Paved roads and urban streets

    Technical studies and supervision of drainage and development works on street 527 in Bagadadji, Commune II of the Bamako District, from the Promenade des Angevins to Mardjié Niaré street (street 428, Niaréla)

    Period
    2005
    Country
    Mali
    Client
    Mairie du district de Bamako
    Funding
    HIPC funds
    Input (person-months)
    16
  148. Buildings and other facilities

    Studies and supervision of the construction of a new 50-seat conference room at the Koulikoro regional assembly headquarters

    Period
    2002 to 2004
    Country
    Mali
    Client
    Assemblée régionale de Koulikoro
    Funding
    National budget
    Input (person-months)
    6
  149. Buildings and other facilities

    Studies, and control and supervision of construction works for education academies with accommodation in Kita, Kati, Koutiala, San, Douentza and on the right bank of Bamako, and for the Bamako Language Institute

    Period
    2003
    Country
    Mali
    Client
    AGETIPE-Mali
    Funding
    World Bank
    Input (person-months)
    12
  150. Buildings and other facilities

    Studies, and control and supervision of fit-out works for the Banque de l’Habitat du Mali (BHM) branch in Mopti

    Period
    2003
    Country
    Mali
    Client
    BHM
    Funding
    BHM
    Input (person-months)
  151. Buildings and other facilities

    Studies and supervision of fit-out works for the Banque de l’Habitat du Mali (BHM) branch in Tombouctou

    Period
    2003
    Country
    Mali
    Client
    BHM
    Funding
    BHM
    Input (person-months)
    16
  152. Buildings and other facilities

    Studies and construction supervision for the Songo community health centre, Doucombo rural municipality, Bandiagara district, Mopti region

    Period
    2003
    Country
    Mali
    Client
    PAIB/AFAR
    Funding
    World Bank
    Input (person-months)
    10
  153. Buildings and other facilities

    Studies and construction supervision for 8 blocks of 3 classrooms, 8 administration and storage blocks and 8 latrine blocks in the Kayes region

    Period
    2002
    Country
    Mali
    Client
    AGETIPE-Mali
    Funding
    National budget
    Input (person-months)
    32
  154. Buildings and other facilities

    Studies and supervision of rehabilitation works on the administration building of the Dowélé Marico high school in Dioila

    Period
    2002
    Country
    Mali
    Client
    Assemblée régionale de Koulikoro
    Funding
    National budget
    Input (person-months)
    4
  155. Buildings and other facilities

    Studies and construction supervision for 12 classrooms, 4 office-storerooms and 4 blocks of 3 latrines in Mènè-Mènè, Dantiandé, Toupéré and Indell, in the Wadouba, Kendé and Ondougou municipalities, Bandiagara district, Mopti region

    Period
    2002
    Country
    Mali
    Client
    PAIB/AFAR
    Funding
    World Bank
    Input (person-months)
    20
  156. Buildings and other facilities

    Studies and construction supervision for the Ondougouda community health centre, Ondougou municipality, Bandiagara district, Mopti region

    Period
    2002
    Country
    Mali
    Client
    PAIB
    Funding
    World Bank
    Input (person-months)
    10
  157. Buildings and other facilities

    Technical studies and supervision of works for the fence and passport office of the Directorate General of Police, the 2nd district police station in Ségou, the fence of the Kaye-ndi police station in Kayes and the refurbishment of the 11th district police station in Bamako, subcontracted with the GUEPE architectural firm

    Period
    2001 to 2002
    Country
    Mali
    Client
    GUEPE/BMCD
    Funding
    Own funds
    Input (person-months)
    6
  158. Buildings and other facilities

    Technical studies and supervision of construction works for the Hôtel Royal in Faladié, Bamako, subcontracted with the GUEPE architectural firm

    Period
    2000 to 2001
    Country
    Mali
    Client
    GUEPE/BMCD
    Funding
    Own funds
    Input (person-months)
    6
  159. Buildings and other facilities

    Technical studies and supervision of construction works for the courthouses of Mopti, Sikasso and Koutiala, subcontracted with the GUEPE architectural firm

    Period
    2000 to 2001
    Country
    Mali
    Client
    GUEPE/BMCD
    Funding
    Own funds
    Input (person-months)
    6
  160. Buildings and other facilities

    Studies and construction supervision for 14 blocks of 3 classrooms, 14 administration and storage blocks and 14 latrine blocks across the Kayes and Koulikoro regions

    Period
    2000
    Country
    Mali
    Client
    AGETIPE-Mali
    Funding
    National budget
    Input (person-months)
    8
  161. Buildings and other facilities

    Studies and construction supervision for 9 dressed-stone classrooms in Fiko, Pigna and Boui, Bandiagara district (former Goundaka arrondissement), Mopti region

    Period
    2000
    Country
    Mali
    Client
    PAIB
    Funding
    World Bank
    Input (person-months)
    22
  162. Buildings and other facilities

    Studies and supervision of the extension of the BMCD branch in Ségou, subcontracted with the GUEPE architectural firm

    Period
    1999
    Country
    Mali
    Client
    GUEPE/BMCD
    Funding
    Own funds
    Input (person-months)
    6
AI-generated ambient image

Planning a development scheme?

Tell us about the site, the planned works and the stage you have reached. We will reply by email.

Get in touch