
Sheet 03 · References
References
162 design and works supervision assignments in 9 countries. Filter by sector, country or funding agency.
162 references
Irrigation and lowland development
Control and supervision of full water control development works on the Woloni and Sirimanso schemes under the second phase of the PDI-BS in the Moyen Bani area
- Period
- 2026 Ongoing
- Country
- Mali
- Client
- Ministère de l’Agriculture
- Funding
- BOAD (West African Development Bank)
- Input (person-months)
- 262
Irrigation and lowland development
Consulting services for the control and supervision of rehabilitation and extension works on the Daye, Hamadja and Korioumé schemes in the Tombouctou district, on behalf of the Tombouctou Rice Plains Development Project (PMPRT)
- Period
- 2026 Ongoing
- Country
- Mali
- Client
- Ministère de l’Agriculture
- Funding
- BOAD (West African Development Bank)
- Input (person-months)
- 24
Irrigation and lowland development
Control and supervision of works for rural access (rural tracks), hydro-agricultural development, drinking water supply and building construction
- Period
- 2026 Ongoing
- Country
- Togo
- Client
- Programme d’urgence de renforcement de la résilience et de la sécurité des communautés (PURS)
- Funding
- BOAD (West African Development Bank)
- Input (person-months)
Irrigation and lowland development
Recruitment of a firm for the control and supervision of rehabilitation works on five (05) water reservoirs in the Savanes region
- Period
- 2026 Ongoing
- Country
- Togo
- Client
- Ministère de l’Agriculture, de la Pêche, des Ressources animales et de la Souveraineté alimentaire
- Funding
- IDA and GAFSP (grants)
- Input (person-months)
Irrigation and lowland development
Control and supervision of rehabilitation works on the Koutoukpa irrigated scheme
- Period
- 2026 Ongoing
- Country
- Togo
- Client
- Ministère de l’Agriculture, de la Pêche, des Ressources animales et de la Souveraineté alimentaire
- Funding
- IDA and GAFSP (grants)
- Input (person-months)
Buildings and other facilities
Environmental and social impact assessments for trading posts in the Koutiala, Ségou and Sikasso regions
- Period
- 2026 Ongoing
- Country
- Mali
- Client
- PRSA
- Funding
- World Bank
- Input (person-months)
Buildings and other facilities
Consultant for the supervision and control of school infrastructure construction works in the municipality of Sangrava (lot 11)
- Period
- 2026 Ongoing
- Country
- Mauritania
- Client
- ETR-ML
- Funding
- World Bank
- Input (person-months)
- 12
Buildings and other facilities
Control and supervision of construction works for five (5) warehouses and related infrastructure in the planned agricultural development zones (ZAAP) of Tône, Tandjouaré, Oti, Cinkassé and Kpendjal-Ouest, in five (05) lots
- Period
- 2026 Ongoing
- Country
- Togo
- Client
- Ministère de l’Agriculture, de la Pêche, des Ressources animales et de la Souveraineté alimentaire
- Funding
- IDA and GAFSP (grants)
- Input (person-months)
Drinking water and pastoral water supply
Feasibility, preliminary design (APS), detailed design (APD) and environmental and social assessment studies for five (05) multi-village drinking water supply systems in the Centre-Nord, Sahel and Nord regions, on behalf of the Drinking Water and Sanitation Services Improvement Project for Resilience Building (PASEPA-2R)
- Period
- 2026 Ongoing
- Country
- Burkina Faso
- Client
- Ministère de l’Agriculture, de l’Eau et des Ressources animales et halieutiques
- Funding
- AfDB
- Input (person-months)
Rural roads and bridges
Preliminary design (APS), detailed design (APD), environmental and social impact assessment (ESIA), socio-economic studies and preparation of bidding documents (DAO), and control and supervision of works for rural access infrastructure and rural tracks in the Koulikoro, Nara and Nioro regions
- Period
- 2026 Ongoing
- Country
- Mali
- Client
- P2-P2RS Mali
- Funding
- AfDB
- Input (person-months)
- 18
Rural roads and bridges
Control and supervision of development works on 40 km of rural tracks under the second phase of the PDI-BS in the Moyen Bani area
- Period
- 2026 Ongoing
- Country
- Mali
- Client
- Ministère de l’Agriculture
- Funding
- BOAD (West African Development Bank)
- Input (person-months)
- 135
Rural roads and bridges
Technical studies and preparation of the technical parts of the bidding documents for the rehabilitation of rural roads in the Bounkani region
- Period
- 2026 Ongoing
- Country
- Côte d'Ivoire
- Client
- PCR-CI
- Funding
- World Bank
- Input (person-months)
- 24
Rural roads and bridges
Supervision of works for a spur road (7.48 km) between Baghdâd and Gueibine in the Trarza wilaya (Rosso municipality) and a rural track (1.5) opening up the Dabane-Winding axis in the Brakna wilaya (M’bagne municipality)
- Period
- 2026 Ongoing
- Country
- Mauritania
- Client
- Ministère de l’Agriculture et de la Souveraineté alimentaire
- Funding
- World Bank
- Input (person-months)
- 24
Rural roads and bridges
Recruitment of a firm to complete the control and supervision of rehabilitation works on 313.107 km of tracks and the construction of two (2) bridges in the Coyah, Boffa and Boké prefectures
- Period
- 2026 Ongoing
- Country
- Guinea
- Client
- Ministère de l’Agriculture
- Funding
- IBRD (International Bank for Reconstruction and Development)
- Input (person-months)
- 3
Irrigation and lowland development
Detailed technical, socio-economic, financial and environmental studies for full water control hydro-agricultural schemes covering a net area of 2,937 hectares in the municipality of Malanville
- Period
- 2025 Ongoing
- Country
- Benin
- Client
- Société béninoise des aménagements agricoles (SoBAA SA)
- Funding
- Own budget (state grant)
- Input (person-months)
- 33
Buildings and other facilities
Technical, architectural, environmental and social studies, and control and supervision of works for the construction of the teacher training institute (IFM) in Bamako, the extension of the Sikasso and Ségou IFMs and the rehabilitation of the Mopti IFM
- Period
- 2025 Ongoing
- Country
- Mali
- Client
- Projet d’amélioration de la qualité et des résultats de l’éducation pour tous au Mali (MIQRA)
- Funding
- World Bank
- Input (person-months)
Rural roads and bridges
Preliminary design (APS) and detailed design (APD) studies and supervision of works for 32 km of tracks in the Oussouye and Ziguinchor departments
- Period
- 2025 Ongoing
- Country
- Senegal
- Client
- Programme national de développement des agropoles du Sénégal
- Funding
- AfDB
- Input (person-months)
Irrigation and lowland development
Recruitment of a firm for technical studies for the construction of water infrastructure and the supervision of works
- Period
- 2024 Ongoing
- Country
- Niger
- Client
- PCRSS-Niger
- Funding
- World Bank
- Input (person-months)
- 125
Drinking water and pastoral water supply
Implementation of support measures for water/WASH projects in the Koro district, Mopti region
- Period
- 2021 Ongoing
- Country
- Mali
- Client
- PROJES
- Funding
- GIZ Mali
- Input (person-months)
- 98
Irrigation and lowland development
Consulting engineering services for detailed design (APD) studies, preparation of bidding documents (DAO), technical assistance to the administration in procurement, and control and supervision of works execution
- Period
- 2020 Ongoing
- Country
- Togo
- Client
- Projet de développement rural de la plaine de l’Oti, zone 5
- Funding
- BOAD loan
- Input (person-months)
- 107
Irrigation and lowland development
Consulting services for detailed technical studies and control and supervision of hydro-agricultural development works on 1,256 ha of irrigated schemes in the OHVN area (Figuiratomo-Selingué, Balanzan, Koursalé and Séguela) under the PRESAN-KL
- Period
- 2016 Ongoing
- Country
- Mali
- Client
- AGETIER-Mali
- Funding
- GAFSP grant
- Input (person-months)
- 144
Drinking water and pastoral water supply
Complementary studies and supervision of water works in the Matam, Tambacounda, Kédougou and Kolda regions
- Period
- 2016 Ongoing
- Country
- Senegal
- Client
- AGETIP Sénégal
- Funding
- IsDB and WAEMU
- Input (person-months)
- 157
Buildings and other facilities
Supervision of the construction of 1,432 social housing units in several towns across the country: lot 7, 52 social housing units in Tidjikdja, and lot 8, 308 social housing units in Kiffa
- Period
- 2023 to 2025
- Country
- Mauritania
- Client
- Délégation générale Taazour
- Funding
- National budget
- Input (person-months)
Rural roads and bridges
Control and supervision of works for the opening, construction, rehabilitation, removal of critical points and routine mechanised maintenance of rural tracks in the 5 regions of Togo: mission 5, Savanes region
- Period
- 2023 to 2025
- Country
- Togo
- Client
- Ministère du Désenclavement et des Pistes rurales, Direction des pistes rurales
- Funding
- BIE (2023 and 2024 budgets)
- Input (person-months)
- 183
Buildings and other facilities
Environmental and social impact assessment (ESIA) for the Bancoumana agro-industrial park
- Period
- 2024
- Country
- Mali
- Client
- AGROPOLE
- Funding
- AfDB
- Input (person-months)
Irrigation and lowland development
Integrated landscape management in the areas of the West Africa Food System Resilience Program (PRSA) in Sikasso
- Period
- 2023 to 2024
- Country
- Mali
- Client
- PRSA-Mali
- Funding
- World Bank
- Input (person-months)
- 42
Irrigation and lowland development
Preliminary design (APS) and detailed design (APD) studies and preparation of bidding documents (DAO) for the installation of teaching-oriented economic units at 30 agricultural technical high schools, for the development of 30,000 ha (lot 3 of 10,000 ha)
- Period
- 2023 to 2024
- Country
- Benin
- Client
- Agence de développement de l’enseignement technique (ADET)
- Funding
- National budget
- Input (person-months)
- 152
Irrigation and lowland development
Supervision and control of works for the construction/rehabilitation and equipment of eleven (11) banana packing and bunch-handling sheds, and equipment for eleven (11) economic interest groups (GIE) in the Tambacounda and Vélingara departments, in two lots: lot 1 and lot 2
- Period
- 2023 to 2024
- Country
- Senegal
- Client
- Société de développement agricole et industrielle du Sénégal (SODAGRI)
- Funding
- World Bank
- Input (person-months)
- 23
Buildings and other facilities
Preparation of bidding documents (DAO) and supervision of construction works for a processing and storage building and two 100 t warehouses in the Kayes and Sikasso regions (Amassa Afrique Verte Mali)
- Period
- 2023 to 2024
- Country
- Mali
- Client
- AMASSA
- Funding
- WFP
- Input (person-months)
- 3
Buildings and other facilities
Studies and control of works for socio-economic infrastructure projects in the Sédhiou region: lot 1
- Period
- 2023 to 2024
- Country
- Senegal
- Client
- SODAGRI
- Funding
- World Bank
- Input (person-months)
Irrigation and lowland development
Recruitment of a consultant for feasibility studies, preliminary design (APS), detailed design (APD), bidding documents (DAO) and works supervision for five (5) lowland development sub-projects covering an estimated total of 540 ha in the Dioila (Togo, Konfon, Kaban, Woh) and Koulikoro (Mafeya) districts
- Period
- 2022 to 2024
- Country
- Mali
- Client
- PARIIS-Mali
- Funding
- World Bank
- Input (person-months)
- 45
Irrigation and lowland development
Studies for the development of 5,940 ha under controlled flooding, the Pekadouzou master plan over 20,000 ha, the consolidation of the Woloni plain (2,300 ha) with an option for conversion to full water control, the rehabilitation of PMB infrastructure and 65 km of tracks in the Bla-San area
- Period
- 2022 to 2024
- Country
- Mali
- Client
- GIC
- Funding
- National budget
- Input (person-months)
- 61
Rural roads and bridges
Preliminary design (APS), detailed design (APD) and bidding documents (DAO) for the construction of three (03) bridges (at Djoungoula, N’tiobougou and Faniena) in the Koulikoro and Sikasso regions
- Period
- 2019 to 2024
- Country
- Mali
- Client
- Unité nationale de coordination du PAAR, ministère des Infrastructures et de l’Équipement
- Funding
- World Bank
- Input (person-months)
Irrigation and lowland development
Supervision and control of priority development works on 620 ha of lowlands in the Kolda, Tambacounda and Kédougou regions, in three lots: lot 1, lot 2 and lot 3
- Period
- 2023
- Country
- Senegal
- Client
- Société de développement agricole et industrielle du Sénégal (SODAGRI)
- Funding
- World Bank
- Input (person-months)
- 22
Rural roads and bridges
Technical studies and supervision of construction works for a bridge and access roads at Dekorobougou serving the rural municipalities of Zaniéna, Nièna and Mininko (Sikasso district) and Kolosso (Kolondieba district), linking the Sikasso and Kolondieba districts
- Period
- 2023
- Country
- Mali
- Client
- PROJES
- Funding
- GIZ Mali
- Input (person-months)
- 43
Irrigation and lowland development
Recruitment of a consultant to carry out three (03) environmental and social impact assessments for the development works at the Togo, Konfon and Woh sites in the Dioïla district
- Period
- 2022 to 2023
- Country
- Mali
- Client
- PARIIS-Mali
- Funding
- World Bank
- Input (person-months)
- 4
Irrigation and lowland development
Studies and supervision of construction and development works (4 boreholes, 1 pond and 2 lowlands) on behalf of the beneficiaries in the Nioro du Sahel region
- Period
- 2022 to 2023
- Country
- Mali
- Client
- PAM, à travers AMASSA-OMADEZA
- Funding
- WFP
- Input (person-months)
- 41.9
Irrigation and lowland development
Supervision and control of development works for the Dogobala lowland dam, Tiemala Banimonotié municipality, Bougouni district and region, lot 4
- Period
- 2022 to 2023
- Country
- Mali
- Client
- Conseil régional de Sikasso
- Funding
- Sikasso Regional Council budget (Danish cooperation funds)
- Input (person-months)
- 13
Irrigation and lowland development
Environmental and social impact assessments for six (6) second-generation PARIIS Mali sub-projects (Tiessoula, Tiengola, Senou, Missango, Tingolé and Dantia)
- Period
- 2022 to 2023
- Country
- Mali
- Client
- PARIIS
- Funding
- World Bank
- Input (person-months)
- 2.35
Drinking water and pastoral water supply
Supervision of works for 22 drinking water supply systems in 16 villages and 6 health centres in the Sikasso, Bougouni and Koutiala regions, in five (5) lots
- Period
- 2022 to 2023
- Country
- Mali
- Client
- Conseil régional de Sikasso
- Funding
- Danish cooperation
- Input (person-months)
- 20
Irrigation and lowland development
Control and supervision of works in the regions of Bamako, Kayes, Koulikoro, Ségou, Nioro, Bougouni and Sikasso on behalf of the STF/DNSA, as part of the implementation of the PDMO 2022 ARC/Mali
- Period
- 2022
- Country
- Mali
- Client
- Commissariat à la sécurité alimentaire, à travers le Secrétariat technique et financier
- Funding
- WFP
- Input (person-months)
- 39
Irrigation and lowland development
Environmental and social impact assessments (ESIA) for the construction of marketing infrastructure in the Kayes region
- Period
- 2021 to 2022
- Country
- Mali
- Client
- PDAZAM
- Funding
- World Bank
- Input (person-months)
- 7.7
Irrigation and lowland development
Control and supervision of rehabilitation works on a first tranche of the flood-recession farming area in the Lake Horo schemes
- Period
- 2021 to 2022
- Country
- Mali
- Client
- Conseil régional de Tombouctou
- Funding
- AFD (French Development Agency)
- Input (person-months)
- 11
Rural roads and bridges
Detailed technical studies, preliminary design and detailed design for the maintenance, removal of critical points, rehabilitation, opening and construction of rural tracks: mission 4
- Period
- 2021 to 2022
- Country
- Togo
- Client
- Ministère du Désenclavement et des Pistes rurales, Direction des pistes rurales
- Funding
- BIE (2021 budget) and SAFER 2021
- Input (person-months)
- 35.5
Rural roads and bridges
Detailed design studies, technical specifications, and control and supervision of rehabilitation/construction works for 67 km of access tracks and 93.68 km of feeder roads identified in 2013
- Period
- 2020 to 2022
- Country
- Togo
- Client
- Ministère de l’Agriculture, de la Production animale et halieutique
- Funding
- EBID loan
- Input (person-months)
- 44
Drinking water and pastoral water supply
Support mission, on behalf of PROJES, for the beneficiaries of socio-economic infrastructure built in the Ségou and Mopti regions, lot 2 (Mopti)
- Period
- 2021
- Country
- Mali
- Client
- PROJES
- Funding
- GIZ Mali
- Input (person-months)
- 54
Irrigation and lowland development
Supervision of consolidation works on village irrigated perimeters (PIV) under phase 1 of the PGIRE in the Kayes district (lot 01)
- Period
- 2020 to 2021
- Country
- Mali
- Client
- Agence de développement rural de la vallée du fleuve Sénégal (ADRS)
- Funding
- World Bank
- Input (person-months)
- 10
Integrated projects
Electrification works using hybrid systems (solar PV and diesel thermal), distribution network and connections for the town of Rharous, Gourma Rharous district, Tombouctou region
- Period
- 2019 to 2021
- Country
- Mali
- Client
- AGETIPE-Mali
- Funding
- World Bank
- Input (person-months)
- 38
Irrigation and lowland development
Technical, economic and environmental studies, and control and supervision of development works for a 25 ha market-gardening scheme in Ansongo, Ansongo municipality and district
- Period
- 2020
- Country
- Mali
- Client
- SOS Sahel
- Funding
- IDA
- Input (person-months)
- 11
Irrigation and lowland development
Detailed design studies for the development of 353 ha of lowlands in the Kara region
- Period
- 2019 to 2020
- Country
- Togo
- Client
- Projet d’appui au développement agricole au Togo (PADAT)
- Funding
- BOAD loan
- Input (person-months)
- 13
Irrigation and lowland development
Technical, environmental and socio-economic studies based on the value-chain approach, and control and supervision of rehabilitation works on the Sindiwara irrigated scheme
- Period
- 2019 to 2020
- Country
- Mali
- Client
- SOS Sahel
- Funding
- IDA
- Input (person-months)
- 8
Irrigation and lowland development
Studies, control and supervision of development works for 4,000 ha of new valleys in the Sédhiou and Kolda regions
- Period
- 2017 to 2020
- Country
- Senegal
- Client
- PAPSEN
- Funding
- Senegal-Italy concessional loan
- Input (person-months)
- 128
Rural roads and bridges
Control and supervision of works on the Soukourale-Oure and Oure-Biko tracks in Keleya municipality, Bougouni district, Sikasso region
- Period
- 2019
- Country
- Mali
- Client
- IPRO-IRRIGAR Sikasso
- Funding
- Federal Republic of Germany
- Input (person-months)
- 12
Irrigation and lowland development
Detailed design studies, preparation of bidding documents (DAO) and ESIA for the development of 910 hectares of lowlands validated in 2013 in the Central Region
- Period
- 2018 to 2019
- Country
- Togo
- Client
- PADAT
- Funding
- BOAD (West African Development Bank)
- Input (person-months)
- 34.5
Drinking water and pastoral water supply
Detailed design (APD), bidding documents (DAO) and supervision of works for the construction of 8 boreholes and the rehabilitation of 2 boreholes in the Saint-Louis, Matam and Louga regions
- Period
- 2017 to 2019
- Country
- Senegal
- Client
- PRAPS/MEPA
- Funding
- World Bank
- Input (person-months)
- 52
Irrigation and lowland development
Consulting services for development studies of 10,000 ha of agro-pastoral plains on the right bank of the Niger in the Djenné district
- Period
- 2015 to 2019
- Country
- Mali
- Client
- AGETIER-Mali
- Funding
- National funding (loan)
- Input (person-months)
- 24
Irrigation and lowland development
Control and supervision of construction works for hydro-agricultural structures in the village of Zana, Sirakorola rural municipality, Koulikoro district, lot 3 (rehabilitation of the Zana submersible weir)
- Period
- 2018
- Country
- Mali
- Client
- IPRO-REAGIR Koulikoro
- Funding
- Global Affairs Canada and KfW
- Input (person-months)
- 6.25
Irrigation and lowland development
Technical and environmental studies for planned agricultural development zones (ZAAP) under the community development programme (PUDC)
- Period
- 2018
- Country
- Togo
- Client
- PUDC-Togo
- Funding
- UNDP
- Input (person-months)
- 6
Rural roads and bridges
Final detailed design (APD) technical studies for 700 km of tracks and crossing structures under the Kaarta/Séféto integrated development project, Kita district, Kayes region, phase I
- Period
- 2018
- Country
- Mali
- Client
- ADRS
- Funding
- National budget
- Input (person-months)
- 48
Irrigation and lowland development
Update of the detailed design of development works for the Dori river basin Dredging, Sanitation and Development project (DRABHID)
- Period
- 2017 to 2018
- Country
- Burkina Faso
- Client
- Ministère de l’Agriculture et des Aménagements hydrauliques
- Funding
- Governments of Italy and Burkina Faso (memorandum of understanding)
- Input (person-months)
- 19.5
Drinking water and pastoral water supply
Studies and supervision of construction works for 58 hand pumps (PMH) and 04 basic water supply systems (AES), and rehabilitation of 02 hand pumps, in the Ségou region, Niono district
- Period
- 2017 to 2018
- Country
- Mali
- Client
- PRRE/AGETIER-Mali
- Funding
- World Bank
- Input (person-months)
- 48
Rural roads and bridges
Study of rural tracks (315 km) in the Kara region under the community development programme (PUDC)
- Period
- 2017 to 2018
- Country
- Togo
- Client
- PUDC
- Funding
- UNDP
- Input (person-months)
- 36
Paved roads and urban streets
Preliminary design (APS) and detailed design (APD) studies for the Bamako outer ring road: RN3 (Nosombougou)-Dabani-Safo-RN27-3rd Bamako bridge-RN6-Sirakoro Méguétana-RN7 link and the Banconi-Dialakorodji-Safo spur, approximately 90 km in total
- Period
- 2017 to 2018
- Country
- Mali
- Client
- Ministère de l’Équipement, des Transports et du Désenclavement
- Funding
- National budget
- Input (person-months)
- 127
Paved roads and urban streets
Control and supervision of construction and paving works on the Baraoueli-Tamani road (30.6 km)
- Period
- 2017 to 2018
- Country
- Mali
- Client
- Ministère des Transports et des Infrastructures routières
- Funding
- National budget
- Input (person-months)
- 116
Irrigation and lowland development
Detailed design (APD) and supervision of works for a multi-village drinking water supply system (AEP-MV) and drip-irrigation hydro-agricultural development, as part of a study and supervision of multi-purpose water development for food security around the deep artesian borehole, Kourinion municipality, Hauts-Bassins region
- Period
- 2016 to 2018
- Country
- Burkina Faso
- Client
- AGETEER
- Funding
- WAEMU
- Input (person-months)
- 17
Paved roads and urban streets
Control and supervision of works to upgrade the Bamako-Koulikoro road to 2x2 lanes (45 km)
- Period
- 2016 to 2018
- Country
- Mali
- Client
- Ministère de l’Équipement, des Transports et du Désenclavement
- Funding
- BOAD (77.62%) and national budget (22.38%)
- Input (person-months)
- 230
Irrigation and lowland development
Control and supervision of rehabilitation works on micro-dams in three villages of the Kati district, Koulikoro region, 2016-2017 season: lot 2, Fadiobougou lowlands (Kati district)
- Period
- 2017
- Country
- Mali
- Client
- IPRO-REAGIR Antenne de Ouéléssébougou
- Funding
- Global Affairs Canada and KfW
- Input (person-months)
- 5.33
Drinking water and pastoral water supply
Preliminary design (APS), detailed design (APD) and bidding documents (DAO) for tracks (160 km), 12 crossing structures, 3 drinking water supply systems and 27 village water systems (SHVA) in Kaarta/Séféto, Kita district, Kayes region: phase I
- Period
- 2017
- Country
- Mali
- Client
- ADRS
- Funding
- National budget
- Input (person-months)
- 28
Irrigation and lowland development
Detailed design (APD), bidding documents (DAO) and supervision of construction works for 10 pastoral ponds
- Period
- 2016 to 2017
- Country
- Senegal
- Client
- PRAPS/MEPA
- Funding
- World Bank
- Input (person-months)
- 11
Irrigation and lowland development
Control and supervision of development works for 500 hectares of agro-sylvo-pastoral and fisheries schemes in Togo: mission 2, Agbandi, Koutoukpa and Gapé-Kpodji sites
- Period
- 2016 to 2017
- Country
- Togo
- Client
- AGETUR-Togo
- Funding
- WAEMU
- Input (person-months)
- 85
Irrigation and lowland development
Control and supervision of development works for 500 hectares of agro-sylvo-pastoral and fisheries schemes in Togo: mission 1, Sadori and Possoa sites
- Period
- 2016 to 2017
- Country
- Togo
- Client
- AGETUR-Togo
- Funding
- WAEMU
- Input (person-months)
- 61
Paved roads and urban streets
Control and supervision of development works on the urban section of the Banamba-Touba road
- Period
- 2016
- Country
- Mali
- Client
- Ministère des Transports et des Infrastructures routières
- Funding
- National budget
- Input (person-months)
- 72
Irrigation and lowland development
Technical studies (APS/APD/DAO) and supervision of marking works on the pastoral track between Bla and San in the Ségou region
- Period
- 2015 to 2016
- Country
- Mali
- Client
- AGETIER-Mali
- Funding
- Kingdom of Denmark
- Input (person-months)
- 13
Irrigation and lowland development
Detailed design study and technical specifications for the development of 697 hectares of lowlands validated in 2012 in the Kara (Dankpen prefecture) and Savanes regions of Togo
- Period
- 2015 to 2016
- Country
- Togo
- Client
- Projet d’appui au développement agricole au Togo (PADAT)
- Funding
- GAFSP grant
- Input (person-months)
- 21.75
Buildings and other facilities
Detailed design technical studies, and control and supervision of warehouse construction works in Kita (CMDT Filiale Ouest SA)
- Period
- 2015 to 2016
- Country
- Mali
- Client
- CMDT
- Funding
- CMDT
- Input (person-months)
- 12
Integrated projects
Project management for the design and supervision of hydro-agricultural infrastructure on behalf of the PADAER in the Kédougou region, Senegal
- Period
- 2015 to 2016
- Country
- Senegal
- Client
- Programme d’appui au développement agricole et à l’entrepreneuriat rural (PADAER)
- Funding
- IFAD (International Fund for Agricultural Development)
- Input (person-months)
- 70
Paved roads and urban streets
Control and supervision of works on urban roads and drainage structures in Commune II of the Bamako District
- Period
- 2015 to 2016
- Country
- Mali
- Client
- Mairie du district de Bamako
- Funding
- AFD (French Development Agency)
- Input (person-months)
- 6
Drinking water and pastoral water supply
Detailed technical studies for drinking water supply and sanitation in the Gao, Koulikoro and Ségou regions; social intermediation in the Ségou region, Ségou and Baraoueli districts
- Period
- 2010 to 2016
- Country
- Mali
- Client
- Ministère de l’Énergie et de l’Eau
- Funding
- ADF (African Development Fund)
- Input (person-months)
- 103
Irrigation and lowland development
Detailed design (APD) studies and preparation of bidding documents for the development of twenty-two (22) lowlands in the Kayes region, under the PAPAM small-scale irrigation project
- Period
- 2015
- Country
- Mali
- Client
- AGETIER-Mali (PAPAM)
- Funding
- IFAD (International Fund for Agricultural Development)
- Input (person-months)
- 28
Irrigation and lowland development
Control and supervision of development works for ten (10) small market-gardening schemes in the Koulikoro region, under the PAPAM small-scale irrigation project
- Period
- 2015
- Country
- Mali
- Client
- AGETIER-Mali (PAPAM)
- Funding
- IFAD (International Fund for Agricultural Development)
- Input (person-months)
- 5
Irrigation and lowland development
Control and supervision of development works on the Kadjila plain and the Molasso lowland, Sikasso district and region
- Period
- 2015
- Country
- Mali
- Client
- IPROSI
- Funding
- EU and German cooperation (KfW)
- Input (person-months)
- 28
Dams and small hydropower
Control and supervision of rehabilitation works on eight (08) micro-dams in the Kayes region, under the PAPAM small-scale irrigation project
- Period
- 2015
- Country
- Mali
- Client
- AGETIER-Mali
- Funding
- IFAD (International Fund for Agricultural Development)
- Input (person-months)
- 12
Integrated projects
Supervision and control of works: rehabilitation of sectors 1, 2, 3 and 5 of the developed scheme (3,180 ha) and maintenance of the Anambé basin dams; installation of hydromechanical equipment, electrification and maintenance of pumping stations and dams; development of 200 ha of small irrigated schemes in the valleys of the Sinthiang Koundara, Bonconto and Wassadou rural communities (Vélingara department, Kolda region)
- Period
- 2015
- Country
- Senegal
- Client
- Société de développement agricole et industrielle du Sénégal (SODAGRI)
- Funding
- World Bank and Spanish cooperation
- Input (person-months)
- 58
Drinking water and pastoral water supply
Control and supervision of rehabilitation works on 23 mini drinking water (AEP) and basic water supply (AES) networks in the Ségou, Mopti, Tombouctou, Gao and Kidal regions
- Period
- 2015
- Country
- Mali
- Client
- UNICEF
- Funding
- UNICEF
- Input (person-months)
- 24
Buildings and other facilities
Technical studies, and control and supervision of construction works for twenty-four (24) school facilities in the Maritime region (Lomé, Golfe)
- Period
- 2014 to 2015
- Country
- Togo
- Client
- AGETUR-Togo
- Funding
- World Bank
- Input (person-months)
Drinking water and pastoral water supply
Technical studies, and control and supervision of works for the Living Environment Improvement Project in selected neighbourhoods of Communes II, III, IV, V and VI
- Period
- 2014 to 2015
- Country
- Mali
- Client
- AGETIPE-Mali
- Funding
- National budget
- Input (person-months)
- 8
Irrigation and lowland development
Hydro-agricultural and fisheries development studies for 600 hectares in the Centre-Nord region
- Period
- 2013 to 2015
- Country
- Burkina Faso
- Client
- AGETEER
- Funding
- WAEMU
- Input (person-months)
- 22
Integrated projects
Studies, and control and supervision of works for the Mô Plain Integrated Rural Development Project (PDRI-Mô): development of 5 lowlands and 3 planned agricultural development zones (ZAAP) with access tracks, 61 successful boreholes and 5 basic water supply systems
- Period
- 2012 to 2015
- Country
- Togo
- Client
- Ministère délégué auprès du ministre de l’Agriculture, de l’Élevage et de la Pêche, chargé des Infrastructures rurales
- Funding
- BOAD (West African Development Bank)
- Input (person-months)
- 10
Rural roads and bridges
Detailed studies, preparation of bidding documents (DAO), and control and supervision of rural track works in the Mô plain
- Period
- 2012 to 2015
- Country
- Togo
- Client
- Ministère délégué auprès du ministre de l’Agriculture, de l’Élevage et de la Pêche, chargé des Infrastructures rurales
- Funding
- BOAD (West African Development Bank)
- Input (person-months)
- 41
Irrigation and lowland development
Technical studies for the 200 ha extension of the Saoune plain in Diré
- Period
- 2014
- Country
- Mali
- Client
- Direction nationale du génie rural, pour le ministère du Développement rural
- Funding
- National funding
- Input (person-months)
- 18
Irrigation and lowland development
Impact assessment and social mobilisation for the implementation and management of fish-farming schemes in the Koutiala, Yorosso, Sikasso, Kadiolo and Yanfolila districts
- Period
- 2014
- Country
- Mali
- Client
- Projet de développement de la filière aquacole (PRODEFA)
- Funding
- PRODEFA (100%)
- Input (person-months)
- 8
Paved roads and urban streets
Detailed design (APD) technical studies, and control and supervision of works on the access road to the CMDT plants in Sikasso
- Period
- 2014
- Country
- Mali
- Client
- Compagnie malienne pour le développement des textiles (CMDT)
- Funding
- CMDT
- Input (person-months)
- 7.5
Integrated projects
Services for the control and supervision of micro-project works in the Kayes region
- Period
- 2013 to 2014
- Country
- Mali
- Client
- PADEC
- Funding
- National budget
- Input (person-months)
- 46
Paved roads and urban streets
Services for detailed design (APD) studies and bidding documents (DAO) for urban roads and drainage structures in Commune II of the Bamako District
- Period
- 2013 to 2014
- Country
- Mali
- Client
- Mairie du district de Bamako
- Funding
- AFD (French Development Agency)
- Input (person-months)
- 15
Irrigation and lowland development
Supervision of works for semi-Californian irrigation schemes in the Boucle du Mouhoun, Hauts-Bassins, Centre-Nord, Nord, Plateau Central and Sud-Ouest regions (lot 1)
- Period
- 2012 to 2014
- Country
- Burkina Faso
- Client
- AGETEER
- Funding
- National funding
- Input (person-months)
- 12
Integrated projects
Studies, and control and supervision of hydro-agricultural development works for the Kara Region Rice Production Development Project (PDPR-K)
- Period
- 2012 to 2014
- Country
- Togo
- Client
- Ministère délégué auprès du ministre de l’Agriculture, de l’Élevage et de la Pêche, chargé des Infrastructures rurales
- Funding
- BADEA and national budget
- Input (person-months)
- 143
Paved roads and urban streets
Control and supervision of construction and paving works on the Banamba road (RN27-Touba link), 13.53 km
- Period
- 2012 to 2014
- Country
- Mali
- Client
- Ministère des Transports et des Infrastructures routières
- Funding
- National budget
- Input (person-months)
- 45
Dams and small hydropower
Update study and supervision of construction works for the Wabessan dam, Sissili province, Centre-Ouest region
- Period
- 2012 to 2013
- Country
- Burkina Faso
- Client
- AGETEER
- Funding
- Burkina Faso state budget
- Input (person-months)
- 64
Dams and small hydropower
Update study and supervision of construction works for the Sarre dam, Kombissiri municipality, Bazega province, Centre-Sud region
- Period
- 2012 to 2013
- Country
- Burkina Faso
- Client
- AGETEER
- Funding
- Burkina Faso state budget
- Input (person-months)
- 54
Drinking water and pastoral water supply
Studies, siting and supervision of works for successful boreholes equipped with hand pumps (PMH), village water systems (SHVA), basic water supply systems (AES) and cistern wells, and construction of modern wells in the Koulikoro region
- Period
- 2011 to 2013
- Country
- Mali
- Client
- Ministère de l’Énergie et de l’Eau
- Funding
- ADF (African Development Fund)
- Input (person-months)
- 52
Buildings and other facilities
Technical studies, and control and supervision of construction and rehabilitation works for infrastructure at the Madina Diassa centres: 6 slaughter areas, 3 mini-dairies, 5 livestock markets and a 70 km track in the PROGEBE intervention area
- Period
- 2010 to 2013
- Country
- Mali
- Client
- PROGEBE
- Funding
- ADF (African Development Fund)
- Input (person-months)
- 35
Buildings and other facilities
Technical studies, and control and supervision of construction and rehabilitation works for the buildings of the MEP decentralised services and livestock infrastructure in the Kayes area on behalf of the PADEPA-KS
- Period
- 2010 to 2013
- Country
- Mali
- Client
- PADEPA-KS
- Funding
- ADF (African Development Fund)
- Input (person-months)
- 45
Drinking water and pastoral water supply
Technical project management for the rehabilitation of two hundred (200) boreholes in the Boucle du Mouhoun region (lot 1)
- Period
- 2012
- Country
- Burkina Faso
- Client
- AGETEER
- Funding
- Burkina Faso state budget
- Input (person-months)
- 33
Rural roads and bridges
Detailed design (APD), bidding documents (DAO), and control and supervision of track rehabilitation and crossing structure construction works in the Koulikoro region
- Period
- 2012
- Country
- Mali
- Client
- CTB Mali
- Funding
- BTC (Belgian Development Agency)
- Input (person-months)
- 15
Drinking water and pastoral water supply
Studies and supervision of works for three (3) large-diameter wells in the villages of Ama, Oualam and Dendya and two (02) cistern wells in the villages of Koumbena and Bounty, Douentza district, Mopti region
- Period
- 2011 to 2012
- Country
- Mali
- Client
- CRS
- Funding
- USAID (Office of Food for Peace)
- Input (person-months)
- 10
Drinking water and pastoral water supply
Technical studies and supervision of water supply works for the social housing sites in the Sikasso region (Bougouni and Koutiala), lot 3
- Period
- 2011 to 2012
- Country
- Mali
- Client
- Ministère de l’Urbanisme et de l’Habitat
- Funding
- National budget
- Input (person-months)
- 31
Rural roads and bridges
Preparation of construction drawings for the Macina-Diafarabé road (43.7 km)
- Period
- 2011 to 2012
- Country
- Mali
- Client
- CGGC
- Funding
- National budget
- Input (person-months)
Irrigation and lowland development
Control and supervision of works on seventeen (17) village irrigated perimeters (PIV) in the Bourem and Gourma-Rharous districts, lots 1 and 2
- Period
- 2010 to 2012
- Country
- Mali
- Client
- Commissariat à la sécurité alimentaire
- Funding
- IFAD (International Fund for Agricultural Development)
- Input (person-months)
- 12
Integrated projects
Services for the control and supervision of micro-project works in the Kayes region
- Period
- 2010 to 2012
- Country
- Mali
- Client
- PADEC
- Funding
- ADF (African Development Fund)
- Input (person-months)
- 123
Rural roads and bridges
Technical studies (including socio-economic impact studies), and control and supervision of works for 130 km of rural tracks in the Kayes Sud area on behalf of the PADEPA-KS
- Period
- 2009 to 2012
- Country
- Mali
- Client
- PADEPA-KS
- Funding
- ADF (African Development Fund)
- Input (person-months)
- 34
Irrigation and lowland development
Control and supervision of development works on the Tomina plain
- Period
- 2011
- Country
- Mali
- Client
- CARE International au Mali
- Funding
- CARE Mali
- Input (person-months)
- 15
Irrigation and lowland development
Topographic surveys and development studies for the Tomina plain
- Period
- 2011
- Country
- Mali
- Client
- CARE International au Mali
- Funding
- CARE Mali
- Input (person-months)
- 6
Integrated projects
Detailed technical studies (geophysical borehole siting) and supervision of works for 15 boreholes, 10 village wells and 10 cistern wells on behalf of the Livestock Development Support Project in North-East Mali (PADENEM, phase II), Gao (amendment)
- Period
- 2011
- Country
- Mali
- Client
- PADENEM
- Funding
- ADF (African Development Fund)
- Input (person-months)
- 20
Rural roads and bridges
Control and supervision of works on link tracks between the villages on the right bank of the main canal of the Baguinéda irrigated scheme
- Period
- 2011
- Country
- Mali
- Client
- Office du périmètre irrigué de Baguinéda (ministère de l’Agriculture)
- Funding
- National budget
- Input (person-months)
- 15
Drinking water and pastoral water supply
Detailed technical studies, and control and supervision of works for 150 MFT boreholes equipped with hand pumps in the Matam, Tambacounda and Kédougou regions, within the UEMOA area
- Period
- 2009 to 2011
- Country
- Senegal
- Client
- AGETIP Sénégal
- Funding
- WAEMU
- Input (person-months)
- 103
Drinking water and pastoral water supply
Feasibility studies for 25 village water supply systems (AEV) from boreholes in the Atlantique department, under the rural drinking water supply (AEP) and sanitation programme (PAEPA) financed by the BAD
- Period
- 2009 to 2011
- Country
- Benin
- Client
- Ministère de l’Énergie et de l’Eau (Bénin)
- Funding
- ADF (African Development Fund)
- Input (person-months)
- 25
Integrated projects
Studies, supervision and capacity building for the Livestock Development Support Project in North-East Mali, phase II (PADENEM): integrated project covering studies and control and supervision of village and pastoral water works (25 boreholes, 40 companion wells, 10 solar stations, 50 km of track), rehabilitation of 30 pastoral wells and deepening of 15 ponds in the Gao region and Gossi municipality
- Period
- 2007 to 2011
- Country
- Mali
- Client
- PADENEM
- Funding
- ADF (African Development Fund)
- Input (person-months)
- 103
Irrigation and lowland development
Detailed design (APD), preparation of bidding documents (DAO), and control and supervision of works for the development of lowlands, ponds, floodplains and market-gardening schemes in the Kayes, Koulikoro, Sikasso, Ségou and Gao regions, in five lots: lot 5, Gao
- Period
- 2010
- Country
- Mali
- Client
- Ministère de l’Agriculture
- Funding
- National budget
- Input (person-months)
- 10
Irrigation and lowland development
Detailed design studies and preparation of the contractors’ consultation file for the deepening of the Mayel channel
- Period
- 2010
- Country
- Mali
- Client
- FODESA
- Funding
- IFAD (International Fund for Agricultural Development)
- Input (person-months)
- 10
Irrigation and lowland development
Detailed design technical studies, including the pumping station, and control and supervision of the main canal of the N’Gorfondou scheme in the Diré district, Tombouctou region
- Period
- 2010
- Country
- Mali
- Client
- Initiatives intégrées pour la croissance économique au Mali (IICEM)
- Funding
- USAID
- Input (person-months)
- 28
Irrigation and lowland development
Detailed design technical studies, including the pumping station, for the 500 ha scheme at Lake Horo with a 14 km irrigation canal divided into two 7 km lots, and control and supervision of works
- Period
- 2010
- Country
- Mali
- Client
- Initiatives intégrées pour la croissance économique au Mali (IICEM)
- Funding
- USAID
- Input (person-months)
- 38
Dams and small hydropower
Technical pre-feasibility studies for the Bily micro power plant in the Kayes region
- Period
- 2010
- Country
- Mali
- Client
- Ministère de l’Énergie, des Mines et de l’Eau
- Funding
- World Bank (IDA)
- Input (person-months)
- 10
Irrigation and lowland development
Control and supervision of works on the Mopti Nord medium-sized scheme (200 ha) on behalf of the Office Riz Mopti through the Mopti Region Rural Development Support Programme (PADER)
- Period
- 2009 to 2010
- Country
- Mali
- Client
- AGETIER pour le compte de PADER/ORM
- Funding
- Special investment budget
- Input (person-months)
- 10
Buildings and other facilities
Architectural and technical studies (APS, APD, DAO) and supervision of construction works for the Ténenkou high school in the Mopti region, subcontracted with SETEM-Bénin
- Period
- 2008 to 2010
- Country
- Mali
- Client
- AGETIPE-Mali
- Funding
- World Bank
- Input (person-months)
- 4.5
Irrigation and lowland development
Technical studies, including pumping stations, and control and supervision of hydro-agricultural development works (village irrigated perimeters) in Kabara, Tonka, Kondi, Kessoubibi, Nianfunké, Sibo, Adina Koira, Findoukaina and Bagadadji, Tombouctou region
- Period
- 2009
- Country
- Mali
- Client
- Initiatives intégrées pour la croissance économique au Mali (IICEM)
- Funding
- USAID
- Input (person-months)
- 48
Irrigation and lowland development
Technical studies (baseline studies, detailed design and bidding documents) for the development of the Banamakan Ontongolo floodplain in the Yélimané district, Kayes region
- Period
- 2009
- Country
- Mali
- Client
- FAO (Organisation des Nations unies pour l’alimentation et l’agriculture)
- Funding
- FAO
- Input (person-months)
- 10
Rural roads and bridges
Technical studies for the construction of the Tofassadaga bridge and its access roads in the Kita district
- Period
- 2009
- Country
- Mali
- Client
- AGETIPE-Mali
- Funding
- National budget
- Input (person-months)
- 1
Rural roads and bridges
Technical studies for the construction of the Wassala bridge in the Bafoulabé district
- Period
- 2009
- Country
- Mali
- Client
- AGETIPE-Mali
- Funding
- National budget
- Input (person-months)
- 12
Paved roads and urban streets
Detailed design (APD) studies with bidding documents (DAO) for the construction of the roads linking Bamako’s third bridge to the RN6 (Ségou road) and the RN27 (Koulikoro road)
- Period
- 2009
- Country
- Mali
- Client
- Ministère de l’Équipement et des Transports
- Funding
- National budget
- Input (person-months)
- 2
Irrigation and lowland development
Development studies for the Neima small village irrigated perimeter, including the pumping station, in the Office Riz Mopti area
- Period
- 2008 to 2009
- Country
- Mali
- Client
- Office Riz Mopti
- Funding
- National budget
- Input (person-months)
- 24
Rural roads and bridges
Technical studies for link tracks (100 km) between the villages on the right bank of the main canal of the Baguinéda irrigated scheme
- Period
- 2008 to 2009
- Country
- Mali
- Client
- Office du périmètre irrigué de Baguinéda
- Funding
- National budget
- Input (person-months)
- 18
Irrigation and lowland development
Technical studies and supervision under the PADL project (integrated project), including assessment, facilitation and oversight of development works for basins and lowlands and the restoration of degraded land in the PADL-DIFFA intervention area
- Period
- 2006 to 2009
- Country
- Niger
- Client
- Ministère de l’Hydraulique
- Funding
- AfDB
- Input (person-months)
- 20
Dams and small hydropower
Technical feasibility studies for the Farako1 micro hydropower plant in the Sikasso region
- Period
- 2008
- Country
- Mali
- Client
- Ministère de l’Énergie, des Mines et de l’Eau
- Funding
- National budget
- Input (person-months)
- 25
Irrigation and lowland development
Technical studies, and control and supervision of development works for market-gardening schemes in the villages of Baraouli and Kalankabougou (Baraouli district), Boukiwèrè (Macina district), Doucouninkoro, Yolo and Tio (Ségou district) and Pouré (Tominian district)
- Period
- 2007
- Country
- Mali
- Client
- DNGR
- Funding
- National budget
- Input (person-months)
- 14
Irrigation and lowland development
Complete studies of the pastoral basins of Ibétemi (350 ha), Soufouroulaye-Diabi (1,350 ha) and Karbaye (900 ha)
- Period
- 2007
- Country
- Mali
- Client
- PADER Mopti
- Funding
- ADF (African Development Fund)
- Input (person-months)
- 16
Irrigation and lowland development
Studies for the upgrading of small village irrigated perimeters (PPIV) on behalf of the Mopti Region Rural Development Support Project
- Period
- 2007
- Country
- Mali
- Client
- PADER Mopti
- Funding
- ADF (African Development Fund)
- Input (person-months)
- 24
Irrigation and lowland development
Technical studies, and control and supervision of development works on 60 ha of the Guéléba plain, Kati district
- Period
- 2007
- Country
- Mali
- Client
- AGETIER
- Funding
- National budget
- Input (person-months)
- 32
Irrigation and lowland development
Technical studies, and control and supervision of development works on 60 ha of the Kéniégué plain, Kati district
- Period
- 2007
- Country
- Mali
- Client
- AGETIER
- Funding
- National budget
- Input (person-months)
- 32
Irrigation and lowland development
Supervision of additional works on the Koumouna hydro-agricultural scheme in the Office du Niger area
- Period
- 2006 to 2007
- Country
- Mali
- Client
- AGETIER
- Funding
- National budget
- Input (person-months)
- 9
Buildings and other facilities
Technical studies, and control and supervision of works for the FM radio stations in Koulikoro, Gao and Tombouctou
- Period
- 2006 to 2007
- Country
- Mali
- Client
- Ministère de la Communication et des Nouvelles technologies (BTESA)
- Funding
- Spanish funds
- Input (person-months)
- 24
Drinking water and pastoral water supply
Technical studies and supervision of water supply works for the sites of 120 social housing units (2006 tranche) in Sikasso
- Period
- 2006 to 2007
- Country
- Mali
- Client
- Ministère de l’Habitat et de l’Urbanisme
- Funding
- National budget
- Input (person-months)
- 32
Drinking water and pastoral water supply
Technical studies and supervision of water supply works for the sites of 30 social housing units (2006 tranche) in Koutiala
- Period
- 2006 to 2007
- Country
- Mali
- Client
- Ministère de l’Habitat et de l’Urbanisme
- Funding
- National budget
- Input (person-months)
- 32
Paved roads and urban streets
Technical studies and supervision of road, stormwater and wastewater drainage works for the social housing in Sikasso and Koutiala
- Period
- 2006 to 2007
- Country
- Mali
- Client
- Ministère de l’Urbanisme et de l’Habitat
- Funding
- National budget and OMH
- Input (person-months)
- 5
Paved roads and urban streets
Studies and supervision of routine maintenance and paving works on roads in the Ségou region (second half of 2006) for the Ségou Regional Roads Directorate
- Period
- 2006 to 2007
- Country
- Mali
- Client
- AGEROUTE-Mali
- Funding
- Road authority
- Input (person-months)
- 12
Rural roads and bridges
Technical studies and supervision of construction works for a 50 m span girder bridge at Siraninkoto, Djidian municipality, Kita district
- Period
- 2005 to 2006
- Country
- Mali
- Client
- AGETIPE-Mali
- Funding
- National budget
- Input (person-months)
- 12
Paved roads and urban streets
Technical studies, and control and supervision of sanitation and paving works on street 466 in Badialan I, Commune III of the Bamako District
- Period
- 2005 to 2006
- Country
- Mali
- Client
- APEJ-Mali
- Funding
- APEJ
- Input (person-months)
- 1
Paved roads and urban streets
Technical studies and supervision of drainage and development works on street 527 in Bagadadji, Commune II of the Bamako District, from the Promenade des Angevins to Mardjié Niaré street (street 428, Niaréla)
- Period
- 2005
- Country
- Mali
- Client
- Mairie du district de Bamako
- Funding
- HIPC funds
- Input (person-months)
- 16
Buildings and other facilities
Studies and supervision of the construction of a new 50-seat conference room at the Koulikoro regional assembly headquarters
- Period
- 2002 to 2004
- Country
- Mali
- Client
- Assemblée régionale de Koulikoro
- Funding
- National budget
- Input (person-months)
- 6
Buildings and other facilities
Studies, and control and supervision of construction works for education academies with accommodation in Kita, Kati, Koutiala, San, Douentza and on the right bank of Bamako, and for the Bamako Language Institute
- Period
- 2003
- Country
- Mali
- Client
- AGETIPE-Mali
- Funding
- World Bank
- Input (person-months)
- 12
Buildings and other facilities
Studies, and control and supervision of fit-out works for the Banque de l’Habitat du Mali (BHM) branch in Mopti
- Period
- 2003
- Country
- Mali
- Client
- BHM
- Funding
- BHM
- Input (person-months)
Buildings and other facilities
Studies and supervision of fit-out works for the Banque de l’Habitat du Mali (BHM) branch in Tombouctou
- Period
- 2003
- Country
- Mali
- Client
- BHM
- Funding
- BHM
- Input (person-months)
- 16
Buildings and other facilities
Studies and construction supervision for the Songo community health centre, Doucombo rural municipality, Bandiagara district, Mopti region
- Period
- 2003
- Country
- Mali
- Client
- PAIB/AFAR
- Funding
- World Bank
- Input (person-months)
- 10
Buildings and other facilities
Studies and construction supervision for 8 blocks of 3 classrooms, 8 administration and storage blocks and 8 latrine blocks in the Kayes region
- Period
- 2002
- Country
- Mali
- Client
- AGETIPE-Mali
- Funding
- National budget
- Input (person-months)
- 32
Buildings and other facilities
Studies and supervision of rehabilitation works on the administration building of the Dowélé Marico high school in Dioila
- Period
- 2002
- Country
- Mali
- Client
- Assemblée régionale de Koulikoro
- Funding
- National budget
- Input (person-months)
- 4
Buildings and other facilities
Studies and construction supervision for 12 classrooms, 4 office-storerooms and 4 blocks of 3 latrines in Mènè-Mènè, Dantiandé, Toupéré and Indell, in the Wadouba, Kendé and Ondougou municipalities, Bandiagara district, Mopti region
- Period
- 2002
- Country
- Mali
- Client
- PAIB/AFAR
- Funding
- World Bank
- Input (person-months)
- 20
Buildings and other facilities
Studies and construction supervision for the Ondougouda community health centre, Ondougou municipality, Bandiagara district, Mopti region
- Period
- 2002
- Country
- Mali
- Client
- PAIB
- Funding
- World Bank
- Input (person-months)
- 10
Buildings and other facilities
Technical studies and supervision of works for the fence and passport office of the Directorate General of Police, the 2nd district police station in Ségou, the fence of the Kaye-ndi police station in Kayes and the refurbishment of the 11th district police station in Bamako, subcontracted with the GUEPE architectural firm
- Period
- 2001 to 2002
- Country
- Mali
- Client
- GUEPE/BMCD
- Funding
- Own funds
- Input (person-months)
- 6
Buildings and other facilities
Technical studies and supervision of construction works for the Hôtel Royal in Faladié, Bamako, subcontracted with the GUEPE architectural firm
- Period
- 2000 to 2001
- Country
- Mali
- Client
- GUEPE/BMCD
- Funding
- Own funds
- Input (person-months)
- 6
Buildings and other facilities
Technical studies and supervision of construction works for the courthouses of Mopti, Sikasso and Koutiala, subcontracted with the GUEPE architectural firm
- Period
- 2000 to 2001
- Country
- Mali
- Client
- GUEPE/BMCD
- Funding
- Own funds
- Input (person-months)
- 6
Buildings and other facilities
Studies and construction supervision for 14 blocks of 3 classrooms, 14 administration and storage blocks and 14 latrine blocks across the Kayes and Koulikoro regions
- Period
- 2000
- Country
- Mali
- Client
- AGETIPE-Mali
- Funding
- National budget
- Input (person-months)
- 8
Buildings and other facilities
Studies and construction supervision for 9 dressed-stone classrooms in Fiko, Pigna and Boui, Bandiagara district (former Goundaka arrondissement), Mopti region
- Period
- 2000
- Country
- Mali
- Client
- PAIB
- Funding
- World Bank
- Input (person-months)
- 22
Buildings and other facilities
Studies and supervision of the extension of the BMCD branch in Ségou, subcontracted with the GUEPE architectural firm
- Period
- 1999
- Country
- Mali
- Client
- GUEPE/BMCD
- Funding
- Own funds
- Input (person-months)
- 6
No reference matches these criteria.

Planning a development scheme?
Tell us about the site, the planned works and the stage you have reached. We will reply by email.
Get in touch